Tender Details

Particulars Details
Title
Fdr Work At 41 Miles Nh 08 To Sukhdev Para Tsr Camp (L 3.50 Km) Under Mungiakami Rd Block/Sh Retaining Wall, Earthwork Filling And C.C Block Etc. During The Year 2024 25, Gr I
Description
Fdr Work At 41 Miles Nh 08 To Sukhdev Para Tsr Camp (L 3.50 Km) Under Mungiakami Rd Block/Sh Retaining Wall, Earthwork Filling And C.C Block Etc. During The Year 2024 25, Gr I
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2024_CEPWD_52127_1
Reference
Number
34/EE/TLM/PWD(RandB)/2024-25
Tender Fee 1000
EMD 48526
Tender Value
Place Mungiakami
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52997

Start Date September 03, 2024 21:30
End Date
Expired 12/09/2024

Expired 656 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii

Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii

Read more
Maintenance of road from 41 miles nh-08 to sukdev para tsr camp (l-3.50 km)/sh- patch metalling, grouting, re-carpeting, sand seal coat etc. under mungiakami rd block during the year 2023-24.

Maintenance of road from 41 miles nh-08 to sukdev para tsr camp (l-3.50 km)/sh- patch metalling, grouting, re-carpeting, sand seal coat etc. under mungiakami rd block during the year 2023-24.

Read more
Fdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami rd block/sh- paver block, c.c block, pucca drain and palasiding work etc. during the year 2024-25

Fdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami rd block/sh- paver block, c.c block, pucca drain and palasiding work etc. during the year 2024-25

Read more
Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall

Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall

Read more
Fdr/urgent construction of retaining wall on road from jb para to bhagirath para part-ii (length - 8.50 km) / sh- retaining wall, back filling etc. portion from ch. 0.00 km to ch. 4.00 km. (group-i)

Fdr/urgent construction of retaining wall on road from jb para to bhagirath para part-ii (length - 8.50 km) / sh- retaining wall, back filling etc. portion from ch. 0.00 km to ch. 4.00 km. (group-i)

Read more
Fdr work of various roads i) brahmacherra ward no. 1 to kakracherra (l023) from ch. 9.395 km to 11.615 km, ii) 45 miles to karkari para (l-5.03 km) under mungiakami rd block/sh- patch wbm3, patch carpeting, grouing, sand seal coat a pucca drain etc.

Fdr work of various roads i) brahmacherra ward no. 1 to kakracherra (l023) from ch. 9.395 km to 11.615 km, ii) 45 miles to karkari para (l-5.03 km) under mungiakami rd block/sh- patch wbm3, patch carpeting, grouing, sand seal coat an pucca drain etc.

Read more
Fdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25

Fdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25

Read more
Fdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i

Fdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i

Read more
Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call

Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call

Read more
Fdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.

Fdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise