Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr Work At 41 Miles Nh 08 To Sukhdev Para Tsr Camp (L 3.50 Km) Under Mungiakami Rd Block/Sh Retaining Wall, Earthwork Filling And C.C Block Etc. During The Year 2024 25, Gr I
|
| Description |
Fdr Work At 41 Miles Nh 08 To Sukhdev Para Tsr Camp (L 3.50 Km) Under Mungiakami Rd Block/Sh Retaining Wall, Earthwork Filling And C.C Block Etc. During The Year 2024 25, Gr I
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_52127_1 |
|
Reference Number |
34/EE/TLM/PWD(RandB)/2024-25 |
| Tender Fee | 1000 |
| EMD | 48526 |
| Tender Value | |
| Place | Mungiakami |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=52997 |
| Start Date | September 03, 2024 21:30 |
| End Date |
Expired
12/09/2024
Expired 656 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii
Fdr work at 41 miles nh-08 to sukhdev para tsr camp (l-3.50 km) under mungiakami rd block/sh- toe wall, c.c block, pucca drain and palasiding work etc. during the year 2024-25, gr-ii
Read moreMaintenance of road from 41 miles nh-08 to sukdev para tsr camp (l-3.50 km)/sh- patch metalling, grouting, re-carpeting, sand seal coat etc. under mungiakami rd block during the year 2023-24.
Maintenance of road from 41 miles nh-08 to sukdev para tsr camp (l-3.50 km)/sh- patch metalling, grouting, re-carpeting, sand seal coat etc. under mungiakami rd block during the year 2023-24.
Read moreFdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami rd block/sh- paver block, c.c block, pucca drain and palasiding work etc. during the year 2024-25
Fdr work at gopalnagar-maharani (gm road) (l-20.00 km) under mungiakami rd block/sh- paver block, c.c block, pucca drain and palasiding work etc. during the year 2024-25
Read moreFdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall
Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall
Read moreFdr/urgent construction of retaining wall on road from jb para to bhagirath para part-ii (length - 8.50 km) / sh- retaining wall, back filling etc. portion from ch. 0.00 km to ch. 4.00 km. (group-i)
Fdr/urgent construction of retaining wall on road from jb para to bhagirath para part-ii (length - 8.50 km) / sh- retaining wall, back filling etc. portion from ch. 0.00 km to ch. 4.00 km. (group-i)
Read moreFdr work of various roads i) brahmacherra ward no. 1 to kakracherra (l023) from ch. 9.395 km to 11.615 km, ii) 45 miles to karkari para (l-5.03 km) under mungiakami rd block/sh- patch wbm3, patch carpeting, grouing, sand seal coat a pucca drain etc.
Fdr work of various roads i) brahmacherra ward no. 1 to kakracherra (l023) from ch. 9.395 km to 11.615 km, ii) 45 miles to karkari para (l-5.03 km) under mungiakami rd block/sh- patch wbm3, patch carpeting, grouing, sand seal coat an pucca drain etc.
Read moreFdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25
Fdr work at uttar maharani bazar to asharamkobra (l-0.40 km) under mungiakami rd block/sh- brick bats wire crates, c.c block and construction of embankment etc. at ch.0.390 km during the year 2024-25
Read moreFdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i
Fdr/ urgent maintenance road from nh-108 b to nutan matia para, (l- 6.41 km ) under during the year 2024-25/ sh wbm-2, wbm-3, carpeting, pucca drain, retaining wall, unlined surface drains etc. complete. ch 0.0 km to 4.95 km./gr-i
Read moreFdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call
Fdr of road from nh 08 to debacherra l 0 50 km at ch 0 035 km during the year 2024 25 sh retaining wall 2nd call
Read moreFdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.
Fdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.
Read moreof your Industry type