Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pavement Works And Filling Of Potholes On Parwanoo Solan Section Of Nh 22 Now Nh 5 From Km 67000 To 106139 On Emergent Basis In The State Of Himachal Pradesh On Item Rate Percentage Basis
|
| Description |
Pavement Works And Filling Of Potholes On Parwanoo Solan Section Of Nh 22 Now Nh 5 From Km 67000 To 106139 On Emergent Basis In The State Of Himachal Pradesh On Item Rate Percentage Basis
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_249862_1 |
|
Reference Number |
11011/95/Tenders/2025-26/10B |
| Tender Fee | 5000 |
| EMD | 97919 |
| Tender Value | |
| Place | Shimla |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=286457 |
| Start Date | September 22, 2025 17:00 |
| End Date |
Expired
29/09/2025
Expired 262 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read morePavement works and filling of potholes on parwanoo solan section of nh 22 now nh 5 from km 67.000 to 106.139 on emergent basis in the state of himachal pradesh on item rate percentage basis 2nd call
Pavement works and filling of potholes on parwanoo solan section of nh 22 now nh 5 from km 67.000 to 106.139 on emergent basis in the state of himachal pradesh on item rate percentage basis 2nd call
Read morePavement works and filling of potholes on parwanoosolan section of nh22 now nh5 from km 67000 to 106139 on emergent basis in the state of himachal pradesh on item rate percentagebasis
Pavement works and filling of potholes on parwanoosolan section of nh22 now nh5 from km 67000 to 106139 on emergent basis in the state of himachal pradesh on item rate percentagebasis
Read moreRoutine maintenance of parwanoo-solan section nh-22 new nh-05 from km 67 000 to km 106 139 in the state of himachal pradesh on item rate percentage basis
Routine maintenance of parwanoo-solan section nh-22 new nh-05 from km 67 000 to km 106 139 in the state of himachal pradesh on item rate percentage basis
Read moreShort term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Read moreof your Industry type