Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Of Existing Obsolete Inergen Gas Distribution System In Zone 3 Zone 4 Zone 5 And Zone 6 Of Operation Area Of Control Room And Battery Room Of Unit I And Ii Including Supply Erection Testing And Commissioning For Fire Protection System
|
| Description |
Please Refer Tender Documents
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_590119_1 |
|
Reference Number |
CE 138 / 25 - 25 / NCTPS II |
| Tender Fee | 0 |
| EMD | 1.75 Lakh |
| Tender Value | - |
| Place | NCTPS II STORES |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=704903 |
| Start Date | August 07, 2025 19:45 |
| End Date |
Expired
21/08/2025
Expired 399 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreRenewal of existing, obsolete inergen gas distribution system in zone 1 and zone 2 of unit i, ii control room including supply, erection, testing and commissioning for fire protection system.
Please refer tender documents
Read moreRenewal of existing symantec endpoint protection
Renewal of existing symantec endpoint protection
Read moreSupply erection testing commissioning of new gaseous fire suppression system inergen ig 541 in ucb control room davr and battery room at 15.5 m and 24 v battery room at 10.5 m elevation in unit i
Supply erection testing commissioning of new gaseous fire suppression system inergen ig 541 in ucb control room davr and battery room at 15.5 m and 24 v battery room at 10.5 m elevation in unit i
Read moreSupply for up gradation of obsolete speed protection system of dhdt rgc turbine
Supply for up gradation of obsolete speed protection system of dhdt rgc turbine
Read moreCt: upgradation of existing obsolete window xp based max dna hmi system installed in various panels
Read more
Replacement of cooling system of the existing cold room
Replacement of cooling system of the existing cold room
Read moreReplacement of cooling system of the existing cold room
Replacement of cooling system of the existing cold room
Read moreof your Industry type