Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Toilet Gsss Guda Ram Singh Dmft Work
|
Description |
Construction Of Toilet Gsss Guda Ram Singh Dmft Work
|
Organisation | Government of Rajasthan |
Tender Id | 2023_RCSCE_376158_4 |
Reference Number |
NIT NO. 08 of 2023-24 ADPC SMSA Pali |
Tender Fee | 1000 |
EMD | 3920 |
Tender Value | |
Place | ADPC Samagra Shiksha Pali |
Link | https://eproc.rajasthan.gov.in |
Start Date | December 08, 2023 15:30 |
End Date |
14/12/2023 ( Expired 527 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreof your Industry type