Tender Details
About Tender
🏗️ Invitation For Bids: 11 Kv Ohl Erection And Dismantling Project 🏗️ Central Coalfields Limited (Cccl), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Erection Cum Di Of An 11 Kv Overhead Line (Ohl) At Purnadih Open Cast Project (Ocp). The Project Involves Laying The Ohl From Near The Ttc Garage Along The Transport Road, Parallel To Q.No. 01 11 Kv Feeder, Then Via The Kdh Pump House To The Kt Substation. It Also Includes The Dismantling Of A Portion Of The Existing 11 Kv Kt Feeder. 📅 Bid Submission Deadline: May 14, 2024, 5:00 Pm Bidders Must Submit A Tender Security Of Inr 14,600. Interested Bidders Should Provide Detailed Technical And Financial Proposals, Including A Comprehensive Plan For The Execution Of The Project In Accordance With The Specifications Provided. Keywords: Erection Cum Di, 11 Kv Ohl, Central Coalfields Limited, Public Sector Undertaking, Infrastructure Project, Bid Submission, Tender Security, Purnadih OcpParticulars | Details |
---|---|
Title |
Erection Cum Di Of 11 Kv Ohl Kt Feeder From Near Ttc Garage Along Transport Road Parallely With Q.No. 01 11 Kv Feeder Then Via Kdh Pump House To Kt Substn And Subsequently Dismantling Part Of Already Existing 11 Kv Kt Feeder Under Purnadih Ocp
|
Description |
Erection Cum Di Of 11 Kv Ohl Kt Feeder From Near Ttc Garage Along Transport Road Parallely With Q.No. 01 11 Kv Feeder Then Via Kdh Pump House To Kt Substn And Subsequently Dismantling Part Of Already Existing 11 Kv Kt Feeder Under Purnadih Ocp
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_307771_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 19 |
Tender Fee | 0 |
EMD | 14600 |
Tender Value | |
Place | Purnadih OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318915 |
Start Date | May 09, 2024 20:30 |
End Date |
14/05/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Extn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Extn cum erection including di of 220/440v lt ohl req for illumination at different locations and as and when required for mine development and along with dismantling of lt ohl from different locations at quarry no. 01 and 02 under purnadih
Read moreDismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Read moreDi of a portion of ht line (feeder no.5 3.3 kv from 5 mva ss to plr camp) by erection of 07 span and dismantling of existing 3 span of the feeder no 5 near plr working area due to progression of mine activity under ashok ocp, piparwar
Di of a portion of ht line (feeder no.5 3.3 kv from 5 mva ss to plr camp) by erection of 07 span and dismantling of existing 3 span of the feeder no 5 near plr working area due to progression of mine activity under ashok ocp, piparwar ar
Read moreDismantling of old, idle not in use 11kv ohl feeder existing between point near four pole structure of q-1 11kv feeder beside rohini transport road to point just before rohini substation under purnadih ocp, nk area
Dismantling of old, idle not in use 11kv ohl feeder existing between point near four pole structure of q-1 11kv feeder beside rohini transport road to point just before rohini substation under purnadih ocp, nk area
Read moreDismantling, di cum erection of 3.3 kv oh electric line, feeding power to the pump set, installed at the h patch, w.r.t. karo ocp, under bnk area.
Dismantling, di cum erection of 3.3 kv oh electric line, feeding power to the pump set, installed at the h patch, w.r.t. karo ocp, under bnk area.
Read moreErection cum di of 11 kv ohl kt feeder from near ttc garage along transport road parallely with q.no. 01 11 kv feeder then via kdh pump house to kt substn and subsequently dismantling part of already existing 11 kv kt feeder under purnadih ocp
Erection cum di of 11 kv ohl kt feeder from near ttc garage along transport road parallely with q.no. 01 11 kv feeder then via kdh pump house to kt substn and subsequently dismantling part of already existing 11 kv kt feeder under purnadih ocp
Read moreErection of earth conductor for 11kv feeders one from kdh old substn to quarry no. 01 substn another for 11kv feeder from rohini substn to quarry no. 02 substn and 3.3 kv feeder from quarry no. 01 substn to purnadih basti under purnadih ocp, nk area
Erection of earth conductor for 11kv feeders one from kdh old substn to quarry no. 01 substn another for 11kv feeder from rohini substn to quarry no. 02 substn and 3.3 kv feeder from quarry no. 01 substn to purnadih basti under purnadih ocp, nk area
Read moreDi of 11kv ohl from backside of rohini ss to q.no. 02 ss and from bank of damodar river near jamdih village (four pole structure of existing 11kv q.no. 01 feeder) to opposite bank of damodar river side of rohini ss under purnadih ocp, nk area
Di of 11kv ohl from backside of rohini ss to q.no. 02 ss and from bank of damodar river near jamdih village (four pole structure of existing 11kv q.no. 01 feeder) to opposite bank of damodar river side of rohini ss under purnadih ocp, nk area
Read morePartial di of 3.3kv ohl at hospital patch for supplying power to 160kva transformer installed at new location in kusumtola basti along with dismantling of 3.3kv ohl feeder existing along old working of quarry no. 02 mine under purnadih ocp
Partial di of 3.3kv ohl at hospital patch for supplying power to 160kva transformer installed at new location in kusumtola basti along with dismantling of 3.3kv ohl feeder existing along old working of quarry no. 02 mine under purnadih ocp
Read moreErection cum diversion of 3.3kv ohl by converting old not in used 11kv ohl into 3.3kv ohl and subsequently dismantling existing 3.3kv ohl from point of diversion to khilawan dhaura under purnadih ocp, nk area
Erection cum diversion of 3.3kv ohl by converting old not in used 11kv ohl into 3.3kv ohl and subsequently dismantling existing 3.3kv ohl from point of diversion to khilawan dhaura under purnadih ocp, nk area
Read moreof your Industry type