Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Of Cc Lining Work And Its Structures Of Narmadapuram Distry Canal Between Rd 0 Km To 15.00 Km Under Tawa Project Division Itarsi.
|
| Description |
Repair Of Cc Lining Work And Its Structures Of Narmadapuram Distry Canal Between Rd 0 Km To 15.00 Km Under Tawa Project Division Itarsi.
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_WRD_308164_1 |
|
Reference Number |
2023_WRD_308164 |
| Tender Fee | 2000 |
| EMD | 39500 |
| Tender Value | - |
| Place | Executive Engineer Tawa Project Division Itarsi |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | October 03, 2023 16:00 |
| End Date |
Expired
09/10/2023
Expired 1107 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction cc lining including repair of canal structures within rd 140m to 4445m of nuapada distry. of sip.
Repair of canal structures
Read moreAnnual repair and maintenance estimate for existing structures and other necessary work for mandi yard itarsi, distt. narmadapuram
Annual repair and maintenance estimate for existing structures and other necessary work for mandi yard itarsi, distt. narmadapuram
Read moreCement concrete lining of disty no.10 and its system of machhagaon main canal system.
Cement concrete lining of disty no.10 and its system of machhagaon main canal system.
Read moreLining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand
Lining repair and construction of balance works of right main canal and its structures of package 1 (rd 0 to 17.16 km) under north koel reservoir project jharkhand
Read moreLining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand
Lining repair and construction of balance works of right main canal and its structures of package 2 (rd 17.16 to 31.40 km) under north koel reservoir project jharkhand
Read moreStabilization of leakage in lining km.35 between ch 34/690 to 34/890 of banda branch canal
Stabilization of leakage in lining km.35 between ch 34/690 to 34/890 of banda branch canal
Read moreGeneral plan work 2025 26 thalachira distributory rectification work of thalachira distributory leak arresting lining work of open canal between ch 0m to 176m and between 500m to 600m general civil work
General plan work 2025 26 thalachira distributory rectification work of thalachira distributory leak arresting lining work of open canal between ch 0m to 176m and between 500m to 600m general civil work
Read moreFormation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand
Formation of pre-bid tie-up and post-award execution tie-up through mou for lining, repair and construction of balance works of right main canal and its structures of package-1 (rd 0 to 17.16 km) under north koel reservoir project, jharkhand
Read moreConstruction of c.c. lining and repair of canal structure in between rd 00 m to 300 m and rd 400 m to 3200 m of landibandha distributary of sip.
Repair of canal structures.
Read moreGeneral-mp-es-annual maintenance 2026-27-silt removal,jungle clearance for kurrissi- pambadi canal between ch 0_000 km to td and its sub canals -general civil work
Engaging man mazdoor and engaging hydraulic excavator for canal cleaning
Read moreof your Industry type