Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Cement Concrete Steps And Rr Masonry Wall From Between Rd 2034.60 Mt To 2044.60 Mt Below Transit Camp, Road From Nh 05 To Dam Top At Njhps Nathpa Distt Kinnaur Hp
|
| Description |
Providing Cement Concrete Steps And Rr Masonry Wall From Between Rd 2034.60 Mt To 2044.60 Mt Below Transit Camp, Road From Nh 05 To Dam Top At Njhps Nathpa Distt Kinnaur Hp
|
| Organisation | SJVN Ltd | Central Govt. Ministry/Department |
| Tender Id | 2024_SJVNL_746156_1 |
|
Reference Number |
PCD-2870 |
| Tender Fee | 1800 |
| EMD | 19896 |
| Tender Value | - |
| Place | Nathpa |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1049305 |
| Start Date | February 16, 2024 17:00 |
| End Date |
Expired
08/03/2024
Expired 951 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePainting for existing civil structures at njhps nathpa, distt.-kinnaur, himachal pradesh
Painting for existing civil structures at
 njhps nathpa, distt.-kinnaur, himachal
 pradesh
Read moreBituminous concreting and premix carpeting resurfacing of roads under nathpa site with 5 year annual maintenance at njhps nathpa distt kinnaur hp
Bituminous concreting and premix carpeting resurfacing of roads under nathpa site with 5 year annual maintenance at njhps nathpa distt kinnaur hp
Read moreProviding protection work cement concrete steps along approach road from nh- 05 to dam top at njhps, nathpa, distt. kinnaur, hp from rd 1237.50 mtr. to 1272.90 mtr.
Providing protection work cement concrete steps along approach road from nh- 05 to dam top at njhps, nathpa, distt. kinnaur, hp from rd 1237.50 mtr. to 1272.90 mtr.
Read moreStrengthening of road by providing concrete steps wall from nh 05 to dam top, between rd 1648.00 m to 1693.00 m, at njhps nathpa, district kinnaur, himachal pradesh.
Strengthening of road
 by providing concrete
 steps wall from nh 05
 to dam top, between
 rd 1648.00 m to
 1693.00 m, at njhps
 nathpa, district
 kinnaur, himachal
 pradesh.
Read moreStrengthening of road towards from gvg bifurcation point to sft d complex and allied works at njhps nathpa district kinnaur hp
Strengthening of road towards from gvg
 bifurcation point to sft d complex and allied
 works at njhps nathpa district kinnaur
 hp
Read moreMetaling premix carpeting of approach road from steel truss bridge to nathpa dam via gate ventilation gallery with 05 year annual maintenance work at njhps nathpa dam distt kinnaur hp
Metaling premix carpeting of approach road from steel truss bridge to nathpa dam via gate ventilation gallery with 05 year annual maintenance work at njhps nathpa dam distt kinnaur hp
Read moreSpecial repair road from camp office to signal company, kote to mt and helipad at hq sector rr under age i cif k
Special repair road from camp office to signal company, kote to mt and helipad at hq sector rr under age i cif k
Read moreMtps i civil circle re-construction of rr masonry compound wall in the south west side (near park area) of thermal nagar 11 at thottilpatty camp of mtps i
Mtps i civil circle re-construction of rr masonry compound wall in the south west side (near park area) of thermal nagar 11 at thottilpatty camp of mtps i
Read moreof your Industry type