Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Construction Opportunity: Nh 37 Section From Jhanji To Demow 🛣️ The National Highways And Infrastructure Development Corporation Limited (Nhidcl), Under The Aegis Of The Central Government's Ministry/Department, Invites Tenders For The Construction Of The Balance Work Of The 4 Laning Of Nh 37 From Jhanji To Demow, In Assam, India. 📍 Project Location: Assam 📅 Bid Submission Deadline: May 1, 2024, 3:00 Pm 💰 Tender Fee: Inr 11,800 💲 Earnest Money Deposit (Emd): Inr 52,48,000 This Project Covers The Development Of A 20 Km Stretch From Km 514.800 To Km 534.800 Under The Sardp Ne Initiative, On An Epc (Engineering, Procurement, And Construction) Basis. Interested Contractors Must Submit Detailed Tenders, Including Financial Bids And Technical Proposals, Adhering To The Project Specifications And Timelines. Keywords: Nhidcl, Construction, Nh 37, Road Works, Sardp Ne, Epc Mode, Tender, Earnest Money Deposit, Infrastructure Development, Assam| Particulars | Details |
|---|---|
| Title |
Nhidcl/Assam /Nh 37/J D Iii/2024/
|
| Description |
Construction Of Balance Work Of The 4 Laning Of The Section From Jhanji To Demowof Nh 37 Pkg Iii Road Works From Km 514.800 To Km 534.800 (20.000 Km),Under Sardp Ne , Under Epc Mode.
|
| Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
| Tender Id | 2024_NHIDC_801213_1 |
|
Reference Number |
NHIDCL/Assam /NH-37/J-D-III/2024/ |
| Tender Fee | 11800 |
| EMD | 52.48 Lakh |
| Tender Value | - |
| Place | Aasam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=842216 |
| Start Date | April 09, 2024 14:30 |
| End Date |
Expired
20/05/2024
Expired 875 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Onsultancy services for authority engineer ae for supervision of pango jorging, singa anleye, kamlang t junction deban and kharsang miao vijaynagar packages of frontier highway nh 913 in arunachal pradesh.
Read moreWidening and development of existing carriageway into 2lane with paved shoulder configuration along with construction of tunnels, viaducts and treatment of vulnerable sliding/sinking zones along nh10 from km 53.50 rangpo to km 79.371 ranipool
Read moreNhidcl / tripura / strengthening / nh-08 / udaipur-sabroom / 2026
Strengthening of udaipur-sabroom section from km 55.000 to km 127.372 of nh-08 and raising and drainage provision in selected stretches of agartala-udaipur section of nh-08 in the state of tripura on epc mode
Read moreConstruction of uni-directional sudhmahadev -dranga twin tube tunnels and its approach roads on chenani - sudhmahadev - goha section of nh-244 in the union territory of jammu and kashmir on epc mode
Read moreBalance work under risk and cost for construction and upgradation of existing road to 2- lane with paved shoulders including geometric improvement of section from start of bagrakot to kafer km 13.00 to km 25.600 (package- ivb) of nh-717a in w.b
Read moreBalance work under risk and cost for construction and upgradation of existing road to 2- lane with paved shoulders including geometric improvement of section from kafer to lava more km 40.00 to km 61.100 of nh-717a in the state of west bengal
Read moreSlope protection and landslide mitigation and reconstruction of road including culvert from km 38.030 to km 38.130 100 mtr. approx. near dungekoti upper pagla jhora on nh 110 on epc mode in the state of west bengal during fy 26-27
Read moreExecution of balance short term maintenance contract works on nh-110 from km 0.000 darjeeling more to km 43.000 giddha pahar, including deployment of machinery and incident management, in darjeeling district, west bengal.
Read moreConsultancy services for preparation of detailed project report for 2 laning with paved shoulder of stretches from km. 00.00 to km.42.80 and from km.60.000 to km.140.00 (length 122.800 km) on nh-02 in the state of mizoram
Read moreBalance work of strengthening of churachandpur to imphal section of old nh-150 (new nh-02) from churachandpur police station (km 402.000) to malom oil depot gate (km 454.798) in the state of manipur on epc mode under nh(o)-ne (length-53.400 km)
Read moreof your Industry type