Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
C/O 104.00 Tr. Span Psc Box Girder Bridge Over Baner Khad On Raj Khart Janyakar Daulatpur Road At Rd 5/740)
|
| Description |
(Sh Balance Work Of 104.00 Mtr. Span Bridge Sub Structure, Super Structure And Both Side Approaches
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_94722_1 |
|
Reference Number |
5288-5330 dated 11.10.2024 |
| Tender Fee | 5000 |
| EMD | 6 Lakh |
| Tender Value | - |
| Place | Kangra |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=139233 |
| Start Date | October 28, 2024 15:30 |
| End Date |
Expired
05/11/2024
Expired 710 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
C/o 35.00 metresapn psc girder bridge over shamshar khad at rd 0/100 on shamshar to panei road km 0/000 to 9/390
C/o 35.00 metresapn psc girder bridge over shamshar khad at rd 0/100 on shamshar to panei road km 0/000 to 9/390
Read moreRebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Rebuilding of existing overaged steel girder bridges of 12.2m span by psc slab of br. no. 1145/1 up & dn (6x12.2m) in jhs-gwl section.
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read moreProvision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Provision of s&t work in connection with rebuilding of existing overaged steel girder bridges of clear span 12.2m by psc slab of bridges in bina-dho section of jhansi division.
Read moreC/o 104.00 mtr. span psc box girder bridge over baner khad on rajal khart janyakar daulatpur road at rd 5/740
Sh- balance work of 104.00 mtr. span bridge, sub structure, super structure and both side approaches)
Read moreFixed bearing for 35 m span psc box girder,free sliding bearing for 35 m span psc box girder,transv
Read more
Fixed bearing for 35 m span psc box girder,free sliding bearing for 35 m span psc box girder,transv
Read more
Conducting load test of 50 mtr span psc box girder bridge over kataula khad at the north campus of iit mandi
Conducting load test of 50 mtr span psc box girder bridge over kataula khad at the north campus of iit mandi
Read moreof your Industry type