Tender Details

Particulars Details
Title
Supply Of Sub Pump Set 210 Mtr Head Discharge 2100 Lpm
Description
Supply Of Sub Pump Set 210 Mtr Head Discharge 2100 Lpm
Organisation Government of Uttarkhand
Tender Id 2023_IRDCE_62346_1
Reference
Number
03/EE/2023-24 Lot 1
Tender Fee 1180
EMD 20600
Tender Value -
Place Office of Executive Engineer Tubewell Division Ra
Link
View Original Tender Notice

https://uktenders.gov.in

Start Date August 26, 2023 23:25
End Date
Expired 08/09/2023

Expired 1133 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Replacement of feed head, discharge head and girth gear for rod mill

Replacement of feed head, discharge head and girth gear for rod mill

Read more
Bolt hex head 19 mm dia x 210 mm with split pin.

Bolt hex head 19 mm dia x 210 mm with split pin.

Read more
Interface cable l-3 fa-2100

Interface cable l-3 fa-2100

Read more
State plan-2026-27-optimisation of production and transmission - arwss to chiranellur in choondal-supply erection testing and commissioning of 1 no submersible motor pumpset having discharge 520 lpm and total head of 150 m including all allied works

State plan-2026-27-optimisation of production and transmission - arwss to chiranellur in choondal-supply erection testing and commissioning of 1 no submersible motor pumpset having discharge 520 lpm and total head of 150 m including all allied works

Read more
Supply of 1.5 hp 1-phase submersible-monoblock(submersible open well) pump head 7/23 mtr discharge 4.0 lps at 15 mtr head similar to make-ksb(model no.-ksb opal open well pump set 1.5 hp 1 phase),crompton greaves,ksr,kirloskar,cri,texmo or equivalent as per spec.

Supply of 1.5 hp 1-phase submersible-monoblock(submersible open well) pump head 7/23 mtr discharge 4.0 lps at 15 mtr head similar to make-ksb(model no.-ksb opal open well pump set 1.5 hp 1 phase),crompton greaves,ksr,kirloskar,cri,texmo or equivalent as per spec.

Read more
Oil cooler assembly (20 lpm)

Oil cooler assembly (20 lpm)

Read more
Magnetic seperator, drum, 500 lpm, rgbs

Magnetic seperator, drum, 500 lpm, rgbs

Read more
Valve assly. breather discharge

Valve assly. breather discharge

Read more
Gauge and discharge observations

Continuation of gauge and discharge observations on baira nallah near village shalli for sai kothi-i (15 mw) hydro electric project for the period of 5 months 11 days (21/10/2026 to 31/03/2027)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise