Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Iv Overhauling Renewal Of Worn Out Spares Bearings Dynamic Balancing Of Heater Drip Pump 4 A 4 B And A Spare Pump And Commissioning Of Pumps 4 A And 4 B During Aoh Of 2024 25
|
Description |
Mtps I Tm Unit Iv Overhauling Renewal Of Worn Out Spares Bearings Dynamic Balancing Of Heater Drip Pump 4 A 4 B And A Spare Pump And Commissioning Of Pumps 4 A And 4 B During Aoh Of 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_465362_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 106 / 2024-25 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=552993 |
Start Date | July 23, 2024 22:30 |
End Date |
29/07/2024 ( Expired 267 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Mtps i m ii oahs fam pdfacs unit iv attending annual overhauling works in plc switch gear panels modules breakers transformers pdfacs equipments and related accessories overhauling of mixing apparatus by dismantling cleaning painting and reassem
Read moreTtps- echp-i- reconditioning of worn out head and tail conveyor pulleys and kept as common spare for belt feeders/ shuttle feeders of rbfd-20, 21, bfd-22,23,sfd-4a,4b at sch-i.
Ttps- echp-i- reconditioning of worn out head and tail conveyor pulleys and kept as common spare for belt feeders/ shuttle feeders of rbfd-20, 21, bfd-22,23,sfd-4a,4b at sch-i.
Read moreMtps i bm unit iii boiler pressure parts aoh 2025 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
Mtps i bm unit iii boiler pressure parts aoh 2025 reconditioning and hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
Read moreRepair work of pump no.6 775hp by refurbishing pump system to restore efficiency including materials, machining, servicing and replacing worn out damaged spares and manufacturing, providing supplying, erecting, commissioning with satisfactory test
Repair work of pump no.6 775hp by refurbishing pump system to restore efficiency including materials, machining, servicing and replacing worn out damaged spares and manufacturing, providing supplying, erecting, commissioning with satisfactory test
Read moreMtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreSalem corporation- repair, renewal reconditioning of 550 h.p hsc pump in unit- iv and h.t cable replacement from vcb i to transformer i at karumalaikoodal booster station, mettur
Salem corporation- repair, renewal reconditioning of 550 h.p hsc pump in unit- iv and h.t cable replacement from vcb i to transformer i at karumalaikoodal booster station, mettur
Read moreTtps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26
Read moreTtps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit iii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit i overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreof your Industry type