Tender Details

Particulars Details
Title
Hiring Of Calibration Services Of Testing Instruments Installed In Isp Paper Testing Lab Under Nabl Scope For Period Of Three Years
Description
Hiring Of Calibration Services Of Testing Instruments Installed In Isp Paper Testing Lab Under Nabl Scope For Period Of Three Years
Organisation Security Printing and Minting Corp of India Ltd | Central Govt. Ministry/Department
Tender Id 2024_SPMCI_768178_1
Reference
Number
GEM/2024/B/5108106
Tender Fee 0
EMD 0
Tender Value
Place India Security Press, Nashik Road
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1071942
Start Date August 16, 2024 20:30
End Date

14/09/2024 ( Expired 268 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Hiring of services of a brand new mahindra bolero power b4 model with ac or higher for a period of 4 years at barauni pump station ps 10

Hiring of services of a brand new mahindra bolero power b4 model with ac or higher for a period of 4 years at barauni pump station ps 10

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Calibration (compulsory) of various instruments and accessories related to different testing instruments of iotl, durgapur from nabl accredited laboratory for period of three years

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Hiring of silent diesel generator sets for the use at various locations under syama prasad mookerjee port, kolkata for a period of 2 years

Hiring of silent diesel generator sets for the use at various locations under syama prasad mookerjee port, kolkata for a period of 2 years

Read more
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis

Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise