Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of V. R Bridge At Rd 12600 Ft Of Deeghot Drain.
|
| Description |
Replacement Of V. R Bridge At Rd 12600 Ft Of Deeghot Drain.
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_418223_1 |
|
Reference Number |
20246A49BA0D 39A1 428C A33F 958956E3AC43164IRR |
| Tender Fee | 6180 |
| EMD | 1.62 Lakh |
| Tender Value | - |
| Place | DEEGHOT |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=494875 |
| Start Date | December 17, 2024 23:00 |
| End Date |
Expired
07/01/2025
Expired 642 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Crr 2025-26 c/o bridge on pr road to pandulagutta, maddulapally (v). mp pegadapally of jagtial district est.cost.rs.200.00 lakhs(5th call)
Crr 2025-26 c/o bridge on pr road to pandulagutta, maddulapally (v). mp pegadapally of jagtial district est.cost.rs.200.00 lakhs(5th call)
Read moreProviding of electronic weighing bridge (ewb) with (60) mts capacity at fruit market yard khanapuram (v) under agriculture market committee khammam of khammam district.
Providing of electronic weighing bridge (ewb) with (60) mts capacity at fruit market yard khanapuram (v) under agriculture market committee khammam of khammam district.
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreBifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-divi
Bifurcation of 11 kv medibavi feeder (185111340102) emanating from 33/11 kv seethaphalmandi ss by erection of new 11kv feeder from 33/11kv ou ss which involves laying of 1.94 km 11kv3x300sq.mm xlpe ug cable (single run) up to the master minds school warasiguda through under pass railway bridge near ou cycling stadium via ou ss h adikmet main road, bouda nagar rd, warasiguda rd no 1 along with erection of 1no. 11 kv feeder vcb at 33/11kv ou ss in seethaphalmandi section of padmarao nagar sub-division in paradise division of secunderabad circle and the work executed by construction division of secunderabad circle under t and d improvements to original works reserved under sc category
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreConstruction of v. r bridge at rd 22215 ft of deeghot drain.
Construction of v.r bridge at r.d 22215 ft of deeghot drain.
Read moreSilt clearance of deeghot drain from rd 15500 ft to 23000 ft.
Silt clearance of deeghot drain from rd 15500 ft to 23000 ft.
Read moreReplacement of bridge cum syphon aqueduct of hodal disty at rd 5200 of deeghot drain.
Replacement of bridge cum syphon aqueduct of hodal disty at rd 5200 of deeghot drain.
Read moreof your Industry type