Tender Details
Particulars | Details |
---|---|
Title |
Insulation Work.
|
Description |
Insulation Work.
|
Organisation | Government of Haryana |
Tender Id | 2023_HBC_296483_1 |
Reference Number |
MSM/PUR/2023/501 |
Tender Fee | 100 |
EMD | 0 |
Tender Value | |
Place | sugar mill meham |
Link | https://etenders.hry.nic.in |
Start Date | July 11, 2023 22:30 |
End Date |
18/07/2023 ( Expired 682 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara
Completion of incomplete work of provn of 01 mw solar power plant work at vadodara
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRound the clock routine maintenance alongwith prive, breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Round the clock routine maintenance alongwith prive , breakdown maintenance work of turbine side auxiliaries viz. pumps (t-bfp, m-bfp, cep etc..), hp/lp valves, other static equipments (deaerator, hotwell, mot, phe etc...) and replacement of hp/
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreof your Industry type