Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Darjiyan Link Road In Distt Gorakhpur In Fy 2023 24 Length 0.995 Km Lot No 1 Of 1
|
| Description |
Construction Of Darjiyan Link Road In Distt Gorakhpur Lot No 1 Of 1
|
| Organisation | Chief Engineer Gorakhpur Zone PWD Gorakhpur UP | State Govt. and UT |
| Tender Id | 2024_CEGKP_899111_1 |
|
Reference Number |
886/135C-Gorakhpur Circle/2024 Dated 07-02-2024 |
| Tender Fee | 2714 |
| EMD | 4.65 Lakh |
| Tender Value | - |
| Place | Gorkahpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1547097 |
| Start Date | February 17, 2024 20:30 |
| End Date |
Expired
27/02/2024
Expired 963 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Block najibabad me sikroda se lalapur link marg per samanya lepan marammat karya lot 34
Block najibabad me sikroda se lalapur link marg per samanya lepan marammat karya lot 34
Read moreSpecial repair work of muili chandpur link road from chainage 3.145 to 4.997 km (length 1.458 km)
Boq
Read moreB.t. renewal work on pooranpura link road gali no. 5 to ahmadpur road length 1.80 km. iv call.
B.t. renewal work on pooranpura link road gali no. 5 to ahmadpur road length 1.80 km. iv call.
Read moreUpgradation of internal link road in domkhar (by way of laying bt, length 1500 mtrs ). under district plan
Upgradation of internal link road in domkhar (by way of laying bt, length 1500 mtrs ). under district plan
Read moreConstruction of link roads (kisan path) 06 nos (length 16.80 km) under package no. 01/2026-27/kums nokha
Construction of link roads (kisan path) 06 nos (length 16.80 km) under package no. 01/2026-27/kums nokha
Read moreDevelopment of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Read moreUnder state sector improvement of nisni link motor road km 0.00-4.325( length -4.325km) in pauri block in district pauri garhwal
Under state sector improvement of nisni link motor road km 0.00-4.325( length -4.325km) in pauri block in district pauri garhwal
Read moreDevelop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Read moreDevelopment of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Read moreDevelopment of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Read moreof your Industry type