Tender Details
Particulars | Details |
---|---|
Title |
Sw.I: Proposed Central Drain At Km: 293.070 To 291.160 = 1.9 Kms In Up And Dn Main Lines Between Kkm Ygd Stations. Sw.Ii: Proposed Toe Wall At Km: 284.600 To 285.500 = 0.9 Kms In Up Main Line Between Kkm Ygd Stations. Sw.Iii: Proposed Ballast Retaining Wall At Km: 256.600 To 256.900 = 0.30 Kms In Up And Dn Main Lines Between Kkm Ygd Stations And Isolated Stretches Of Sse/P.Way/Ya Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76800222 |
Reference Number |
Engg-GTL-South-1682 |
Tender Fee | 0 |
EMD | 2.79 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/76800222/viewNitPdf_4677923.pdf |
Start Date | August 15, 2024 00:47 |
End Date |
09/09/2024 ( Expired 226 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
One time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
One time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreRepair, maintenance and cleaning of sewage lines, drainage system including day to day services at chnc and repair to fencing, drain, path, culvert and retaining wall, toe wall water supply installations and other areas under ge (u) udhampur
Repair, maintenance and cleaning of sewage lines, drainage system including day to day services at chnc and repair to fencing, drain, path, culvert and retaining wall, toe wall water supply installations and other areas under 
 ge (u) udhampur
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of gabion/retaining wall at parshuram ghat under risk and cost of the rehabilitation and up-gradation of nh-66 (old nh-17) from km. 161.600 to km. 205.400 (kashedi - parshuram ghat section) to four lanes in the state of maharashtra under
Construction of gabion/retaining wall at parshuram ghat under risk and cost of the rehabilitation and up-gradation of nh-66 (old nh-17) from km. 161.600 to km. 205.400 (kashedi - parshuram ghat section) to four lanes in the state of maharashtra under
Read moreConstruction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2
Read moreEngagement of user fee agency on the basis of cb through e-tender at chapar fp at design km 138.552 for 4 laning of muzzaffarnagar haridwar section from design km 130.560 to km 166.000 of nh. 58 in up and uttarakhand
Engagement of user fee agency on the basis of cb through e-tender at chapar fp at design km 138.552 for 4 laning of muzzaffarnagar haridwar section from design km 130.560 to km 166.000 of nh. 58 in up and uttarakhand
Read moreConstruction of road from main road to up to the house of sripad narshiv parab house at gaonkarwada in ward no. 11 of bmc construction of retaining wall near main road to upto the house of premnath s. parab house at gaonkarwada in w no 11
Construction of road from main road to up to the house of sripad narshiv parab house at gaonkarwada in ward no 11 of bmc construction of retaining wall near main road to upto the house of premnath s parab house at gaonkarwada in wno11 of
Read moreNh-744-reconstruction of collapsed retaining wall.-nh-744- reconstruction of collapsed retaining wall at km.19/500 nh 744(in between sng school and ambalathumkala.)
Nh-744-reconstruction of&#x0d collapsed retaining wall.-nh-744-&#x0d reconstruction of collapsed retaining wall at km.19/500 nh 744(in between sng school and ambalathumkala.)
Read moreImprovement work at the identified accidental location from km 163.025 to km 163.525 (near gumga village) in project section of shivnagar-ambikapur of nh- 130 under contingency head of work of rehabilitation and up-gradation of nh-111 shivnagar to am
Improvement work at the identified accidental location from km 163.025 to km 163.525 (near gumga village) in project section of shivnagar-ambikapur of nh- 130 under contingency head of work of rehabilitation and up-gradation of nh-111 shivnagar to am
Read moreof your Industry type