Tender Details
Particulars | Details |
---|---|
Title |
Improvement Works To Drain And Providing Culvert In The North Side Of 263 S Road From Gate Number 6 To Gate Number 8 In Ichs Area At Ttps Reach 2
|
Description |
Improvement Works To Drain And Providing Culvert In The North Side Of 263 S Road From Gate Number 6 To Gate Number 8 In Ichs Area At Ttps Reach 2
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_505890_1 |
Reference Number |
CE SE C TTPS Spec. No 236 24 25 |
Tender Fee | 0 |
EMD | 9200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=601842 |
Start Date | November 29, 2024 23:30 |
End Date |
17/12/2024 ( Expired 174 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreChief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Chief minister urban infrastructure development scheme fourth phase cc road construction work from akajhiri road to kali mata in ward number 01 and cc road and drain construction from pichore road to the houses of bunty pal gopal kalla khalak
Read moreTalegaon industrial area, ph i. widening of existing north and south side roads
Talegaon industrial area, ph i. widening of existing north and south side roads&#x0d to four lane road at plot of ms. hyundai at t.i.a. ph i&#x0d
Read moreProvn of bathroom and toilet block in otm accn bldg no. 40 and provn of fence at boundary wall from palta road junction ishapur to mt area of 2 sikh at bgtc area barrackpur under ge barrackpore
Provn of bathroom and toilet block in otm accn bldg no. 40 and provn of fence at boundary wall from palta road junction ishapur to mt area of 2 sikh at bgtc area barrackpur under ge barrackpore
Read moreRepair to culvert, drain cover with ci grating, gates, sign board etc, certain misc works of area-ii and repairs to security wall, boundary wall, fencing of area-ii under age (b/r) central at ge (west) colaba, mumbai
Repair to culvert, drain cover with ci grating, gates, sign board etc, certain misc works of area-ii and repairs to security wall, boundary wall, fencing of area-ii under age (b/r) central at ge (west) colaba, mumbai
Read moreof your Industry type