Water Pressure Relief Valves
Results for: Water Pressure Relief Valves
Find the latest Water Pressure Relief Valves tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Water Pressure Relief Valves e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Pressure safety relief valves as per sl. no. 1 of annexure i,pressure safety relief valves as per sl. no. 2 of annexure i
Pressure safety relief valves as per sl. no. 1 of annexure i,pressure safety relief valves as per sl. no. 2 of annexure i
Organisation: Directorate of Purchase and Stores | Department of Atomic Energy
Start Date: October 05, 2026 17:25
Read more
Due Date: 10 days left
Spn/b957-000-yr-mr-1360/176 pressure relief valves for bina petchem and refinery expansion project (bprep)
Spn/b957-000-yr-mr-1360/176 pressure relief valves for bina petchem and refinery expansion project (bprep)
Organisation: Engineers India Limited,MoPNG | Head Office-Delhi,EIL,MoPNG
Start Date: September 28, 2026 22:30
Place: As per bidding document
Read more
Due Date: 5 days left
Corrigendum Issued
Procurement of 750 mm dia 10 bar pressure rated butterfly valves for the water supply network under aemaintwwws south division
Procurement of 750 mm dia 10 bar pressure rated butterfly valves for the water supply network under aemaintwwws south division
Tender EMD: 17000
Tender Fee: 1888
Organisation: Municipal Corporation of Greater Mumbai | Hydraulic Engineer Department | Dy.H.E.(Maintenance) | E.E.W.W.(Maint.) Metre Workshop (Mech and Elect)
Start Date: September 16, 2026 16:30
Place: Maharashtra, vile parle west
Read more
Due Date: 4 days left
Supply and fitment of pressure vessel,supply and fitment of fresh water hydrophore pump,supply and fitment of automatic control panel cum motor er,supply and fitment of pressure switch,supply and fitment of safety relief valve,supply and fitment of pressure gauge,supply and fitment of isolation valves,supply and plumbing of piping network,supply and plumbing of piping network,supply and fitment of water tank,installation and commissioning
Supply and fitment of pressure vessel,supply and fitment of fresh water hydrophore pump,supply and fitment of automatic control panel cum motor er,supply and fitment of pressure switch,supply and fitment of safety relief valve,supply and fitment of pressure gauge,supply and fitment of isolation valves,supply and plumbing of piping network,supply and plumbing of piping network,supply and fitment of water tank,installation and commissioning
Organisation: Indian Navy | Department of Military Affairs
Start Date: September 29, 2026 18:31
Read more
Due Date: 3 days left
Repair/replacement of pressure filter plant,external water supply distribution pipe line system ,control valves,valve chamber ,pump sets ,starter panels and connected works at residential area of npol kochi
Repair/replacement of pressure filter plant,external water supply distribution pipe line system ,control valves,valve chamber ,pump sets ,starter panels and connected works at residential area of npol kochi
Tender EMD: 28000
Tender Fee: 500
Organisation: E-IN-C BRANCH - MILITARY ENGINEER SERVICES | ADG (OF and DRDO) AND CE (R and D) SECUNDERABAD - MES | AGE (I) RND KOCHI - MES
Start Date: October 08, 2026 23:30
Place: Kakkanad
Read more
Due Date: 12 days left
Gr-1 ball valve_size-8mm with end connector,gr-1 ball valve_size-16mm with end connector,gr-1 ball valve_size-25mm with end connector,gr-1 ball valve_size-30mm with end connector,gr-1 ball valve_size-35mm with end connector,gr-1 ball valve_size-42mm with end connector,gr-1 air hydrant valve assembly_size-16mm,gr-1 non return stop valves-42mm_end connectr,gr-1 nr check valve-16 mm with end connector,gr-1 nr check valve-42 mm with end connector,gr-1 solenoid valve_size-16mm with end conn,gr-1 pr. reducing valve_ size-16mm_8 to 7 bar,gr-1 pressure relief valve_size-16mm_7.7 bar,gr-1 pressure relief valve_size-16mm_4.4 bar,gr-1 pr. reducing valve_ size-30mm_8 to 2 bar,gr-1 pressure relief valve_size-30mm_2.2 bar,gr-1 pr. gauge with isolation valve_size-8mm,gr-1 equal tee pieces size-16mm with end conn,gr-1 equal tee pieces size-20mm with end conn,gr-1 equal tee pieces size-25mm with end conn,gr-1 equal tee pieces size-30mm with end conn,gr-1 equal tee pieces size-42mm with end conn,gr-1 unequal tee_16x16x8 mm_wit
Gr-1 ball valve_size-8mm with end connector,gr-1 ball valve_size-16mm with end connector,gr-1 ball valve_size-25mm with end connector,gr-1 ball valve_size-30mm with end connector,gr-1 ball valve_size-35mm with end connector,gr-1 ball valve_size-42mm with end connector,gr-1 air hydrant valve assembly_size-16mm,gr-1 non return stop valves-42mm_end connectr,gr-1 nr check valve-16 mm with end connector,gr-1 nr check valve-42 mm with end connector,gr-1 solenoid valve_size-16mm with end conn,gr-1 pr. reducing valve_ size-16mm_8 to 7 bar,gr-1 pressure relief valve_size-16mm_7.7 bar,gr-1 pressure relief valve_size-16mm_4.4 bar,gr-1 pr. reducing valve_ size-30mm_8 to 2 bar,gr-1 pressure relief valve_size-30mm_2.2 bar,gr-1 pr. gauge with isolation valve_size-8mm,gr-1 equal tee pieces size-16mm with end conn,gr-1 equal tee pieces size-20mm with end conn,gr-1 equal tee pieces size-25mm with end conn,gr-1 equal tee pieces size-30mm with end conn,gr-1 equal tee pieces size-42mm with end conn,gr-1 unequal tee_16x16x8 mm_wit
Organisation: Garden Reach Ship Builders and Engineers Limited (GRSE) | Department of Defence Production
Start Date: September 30, 2026 22:07
Read more
Due Date: 4 days left
Sitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Sitc of 4.0 kw jockey pump with motor,sitc of automatic fire pump control panel for 4 pumps,sitc of pressure gauge,sitc of ul fm approved pressure switch,refixing, tc of existing air vessel,sitc of double flanged sluice valves pn 16,sitc of swing check nrv pn 16,sitc of cast iron bucket type strainer 80 mm,sitc of gear-operated dual plate nrv 80 mm pn 16,sitc of lockable butterfly valves pn 16,sitc of class-c heavy-duty ms fire hydrant piping,fabrication, installation of structural steel supports,sitc of pressure relief valve with delivery header,sitc of single-headed stainless-steel landing valve,sitc of double-headed stainless-steel landing valve,sitc of stainless-steel branch pipe with gun metal nozzle,sitc of 5x type low expansion foam branch,sitc of nfpa 1964 compliant jet fire nozzle,sitc of rrl fire hose with couplings,sitc of first aid hose reel with 30 m tph,sitc of automatic air release valve 25 mm,sitc of brass ball valve 25 mm,modification extension of existing fh piping,sitc of gi earthing strip
Organisation: Balmer Lawrie and Company Limited | Balmer Lawrie and Company Limited
Start Date: October 09, 2026 16:13
Read more
Due Date: 2 days left
Fuel filter,pipe,tacho hour meter,volt meter,water temp gauge,eng oil pressure gauge,switch ing,universal joint assy,control valve assy,main clutch assy,steering clutch assy,fan,safety filter,primary filter,oil filter,trans machine filter,universal shaft,drive shaft,kit u joint,hyd hose,hose,hyd hose,hyd hose,hyd hose,air filter,filter element,element filter hyd,oil filter txn,air filter hyd,air filter ,air filter outer,lub oil filter,fuel filter,speed meter,relay er,hyd hose,alternator,valve,valve relief,valve,valve two function
Fuel filter,pipe,tacho hour meter,volt meter,water temp gauge,eng oil pressure gauge,switch ing,universal joint assy,control valve assy,main clutch assy,steering clutch assy,fan,safety filter,primary filter,oil filter,trans machine filter,universal shaft,drive shaft,kit u joint,hyd hose,hose,hyd hose,hyd hose,hyd hose,air filter,filter element,element filter hyd,oil filter txn,air filter hyd,air filter ,air filter outer,lub oil filter,fuel filter,speed meter,relay er,hyd hose,alternator,valve,valve relief,valve,valve two function
Organisation: Indian Army | Department of Military Affairs
Start Date: September 26, 2026 19:20
Read more
Due Date: 9 days left
Contract Awarded
Pressure relief valves
Organisation: ENGINEERS INDIA Limited | Ministry of Petroleum and Natural Gas
Start Date: May 31, 2023 21:57
Read more
Due Date: Expired 1212 days ago
Pressure relief valves
Design, engineering, procurement, fabrication, inspection, testing, transportation and supply of the pressure relief valves to be installed at nrl, assam including erection and commissioning and mandatory spares special tools and tackles, supervision
Tender EMD: 0
Tender Fee: 0
Organisation: Central Public Procurement Portal 1
Start Date: July 24, 2023 14:30
Place: Online
Read more
Due Date: Expired 1125 days ago
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Support
Click
Here to Download Dockets
of your Industry type
of your Industry type