Results for: Valve Strainers
Find the latest Valve Strainers tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Valve Strainers e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Set of strainers for pneumatic valve s comprising of :1) for c2 & a9 valve pt.no.1= 6 nos. 2) for n1 reducing valve pt. no.2=2 nos. 3)for a 9 & sa 9 valve pt.no.3=8 nos. 4) for safety valve pt.no. 4=4 nos.to cee s drg no; loco/4/ar/032. .
Set of strainers for pneumatic valve s comprising of :1) for c2 & a9 valve pt.no.1= 6 nos. 2) for n1 reducing valve pt. no.2=2 nos. 3)for a 9 & sa 9 valve pt.no.3=8 nos. 4) for safety valve pt.no. 4=4 nos.to cee s drg no; loco/4/ar/032. .
Procurement of pressure balance valve and y-strainers of bfp at stg-i,sgtpp.
Procurement of pressure balance valve and y-strainers of bfp at stg-i,sgtpp.
🏭 Procurement Opportunity: Pressure Balance Valve and Y-Strainers for SgTPP 🛠️ The West Bengal Power Development Corporation Limited (WBPDCL) is seeking bids for the procurement of Pressure Balance Valves and Y-Strainers for the Boiler Feed Pump (BFP) at Stage-I of the Sagardighi Thermal Power Project (SgTPP). 📅 Bid Submission Deadline: April 29, 2024, 3:00 PM This procurement is a critical component of the ongoing operations at SgTPP and is open to all qualified suppliers. Interested parties are requested to submit detailed bids, including technical specifications, pricing, and delivery schedules, by the stipulated deadline. Keywords: Procurement, Pressure Balance Valve, Y-Strainers, WBPDCL, Sagardighi Thermal Power Project, State Govt. and UT, BFP, Tender, Bid Submission
Opening and closing of flanges, strainers and valve replacements in ammonia complex during ata 2025.
Opening and closing of flanges, strainers and valve replacements in ammonia complex during ata 2025,as per tender conditions.
Foot valve pn-6 body gm (en1982 gr. cc 491k) with brass strainers having 5mm dia perforation
Fabrication works for provision of bypass line for deluge valve main header strainers at bpcl bokaro lpg plant
Fabrication works for provision of bypass line for deluge valve main header strainers at bpcl bokaro lpg plant
Fabrication of universal joints for floating pumps, repairing of nrv/foot valve/sluice valves of different sizes, bends and strainers for monsoon 25-26 at block-b project.
Fabrication of universal joints for floating pumps, repairing of nrv/foot valve/sluice valves of different sizes, bends and strainers for monsoon 25-26 at block-b project.
Percent a0set of strainers for pneumatic valves comprising of percent a0(1) percent a0for c2 & a9 valve, pt.1 = 3 percent a0nos. percent a0(2) percent a0for hs4 valve, pt.2 = 1 no. percent a0(3) percent a0for a9 & sa9 valve, pt.3 = 2 nos. (4) percent a0for safety valve, pt.4 = 1 percent a0no. to cees drg. no. loco/4/ar/032 percent a0
For complete deion and other details, please refer to tender
Supply, installation and commissioning, trial and testing of float switch, solenoid valve, u trap header, valves and strainers, high level floats, insulation, ups and anhydras ammonia gas at 500 mt capacity teliamura cold storage, teliamura, khow
Supply, installation and commissioning, trial and testing of float switch, solenoid valve, u trap header, valves and strainers, high level floats, insulation, ups and anhydras ammonia gas at 500 mt capacity teliamura cold storage, teliamura, khow
Tungabhadra hydro electric scheme
Supply of gear operated double offdisc design double flanged end butterfly valve of dn 250 mm for stage i stator cooler strainers pertaining to mechanical section , mechanical sub division of dam power house
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type