Results for: Turbine Control System
Find the latest Turbine Control System tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Turbine Control System e-tenders. Get matching tenders on WhatsApp, with coverage across government websites, GeM and e-Procurement portals.
Conducting third party inspection and quality control and assurance for lift irrigation scheme for filling up of indaragi and other 27 tanks by lifting water from tungabhadra river in gangavathi taluka, koppal district.
Conducting third party inspection and quality control and assurance for the work survey, investigation, design, supply, erection, testing and commissioning of lift irrigation scheme for filling up of indaragi and other 27 tanks by lifting water from tungabhadra river in gangavathi taluka, koppal district comprising of following components construction of jackwell cum pump house, vertical turbine pumps coupled to ht motors electrical panel, soft starter, capacitors, power transformers, 33/6.6 kv substation, 33 kv power line, and 33kv terminal bay, rising main, pressure distribution network through ms/hdpe/opvc pipes with installation of surge protection system, supply of spares and tools including operation and maintenance for five years after successful commissioning of the entire system on turnkey basis
Ot 36/26-27
Mtpsii es circletgmca division inspection overhauling replacement of bladders seal kit in hydraulic accumulators of ehg system tdbfp drive turbine control oil systemhplp bypass oil system during capital overhauling 2026
Various mark v modules for gas turbine control system,
Various mark v modules for gas turbine control system
Supply/ procurement of mark-vi speedtronic gas turbine control system cards
Supply/ procurement of mark-vi speedtronic gas turbine control system cards for smooth running of 1x21 mw gtg unit no,- 5 under gas thermal power station, baramura khowai tripura.
π Procurement Opportunity: Mark-VI Speedtronic Gas Turbine Control System Cards π‘ Tripura Power Generation Limited, a State Government Undertaking, is seeking bids for the supply/procurement of Mark-VI Speedtronic Gas Turbine Control System Cards. These cards are critical for the smooth operation of a 1x21 MW Gas Turbine Generator Unit No.- 5 at the Gas Thermal Power Station in Baramura, Khowai, Tripura. π Bid Submission Deadline: April 4, 2024, 5:00 PM Tender Fee: INR 1000 Earnest Money Deposit (EMD): INR 105870 Interested bidders should possess the necessary technical expertise and experience in supplying such control system components. Proposals must include detailed specifications, pricing, and delivery timelines, ensuring compliance with the project's technical and quality requirements. Keywords: Mark-VI Speedtronic Gas Turbine, Control System Cards, Power Generation, Tripura Power Generation Limited, State Govt. and UT, Procurement, Tender, EMD
2.53 ghz dual core embedded controller for gas turbine control system
π Invitation for Bid: 2.53 GHz DUAL CORE EMBEDDED CONTROLLER π The Department of Military Affairs, Ministry of Defence, is seeking bids for the supply of 2.53 GHz Dual Core Embedded Controllers for a Gas Turbine Control System. π οΈ ποΈ Bid Submission Deadline: July 18, 2024, 1:00 PM Suppliers with expertise in advanced embedded controller technology for critical defense systems are encouraged to submit detailed bids. Keywords: 2.53 GHz DUAL CORE EMBEDDED CONTROLLER, Gas Turbine Control System, Ministry of Defence, Department of Military Affairs, Defence Procurement, Bid Invitation
2.53 ghz dual core embedded controller for gas turbine control system
Design, engineering, supply and commissioning of hardware and software for upgradation of existing ge mark-v gas turbine control system to latest ge mark vie gas turbine control system of gtg-iii
Design, engineering, supply and commissioning of hardware and software for upgradation of existing ge mark-v gas turbine control system to latest ge mark vie gas turbine control system of gtg-iii
Procurement of working oil for electro hydraulic turbine control system for unit 5and6, csctpp, chhabra
Procurement of working oil for electro hydraulic turbine control system for unit 5and6, csctpp, chhabra
Procurement of spares of diasys netmation make dcs installed for tcs(turbine control system) and tps (turbine protection system) in 2x660mw sstpp, dongalia, khandwa
Procurement of spares of diasys netmation make dcs installed for tcs(turbine control system) and tps (turbine protection system) in 2x660mw sstpp, dongalia, khandwa
Procurement of 05 nos. of panel hmi spares for process gas compressor turbine control systems sgt 400 turbine at bpb platform bns asset.
Procurement of 05 nos. of panel hmi spares for process gas compressor turbine control systems sgt 400 turbine at bpb platform bns asset.
Get new Turbine Control System tenders
Tell us what you supply or do. We'll send you matching tenders on WhatsApp and call you about them.
Free tender checklists for your industry βCan't meet a tender's eligibility alone? Find a JV or local partner β
Need help bidding on these tenders?
Our team helps with GeM registration, eligibility, tender documents, compliance and bid submission.
Get bid support