Results for: Solar Energy Corporation of India Limited

10,000+ tenders

Find the latest Solar Energy Corporation of India Limited tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Solar Energy Corporation of India Limited e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.

Electric pipe freezing unit,extension kit upto 2 inch 131160 r,insert 1/8 inch pack of 2 as per attached specification

Electric pipe freezing unit,extension kit upto 2 inch 131160 r,insert 1/8 inch pack of 2 as per attached specification

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: October 10, 2026 00:05
Read more
Due Date: 1 days left

Jp/b933-999-ee-t-3002/1015 for electrical tracing work of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)

Electrical tracing work of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)

Tender EMD: 1 Crore
Organisation: Engineers India Limited,MoPNG | Head Office-Delhi,EIL,MoPNG
Start Date: October 16, 2026 22:30
Place: As per tender document
Read more
Due Date: 21 days left

Spn/b933-000-wb-mr-3123/225 - miscellaneous valves for bina petchem and refinery expansion project (bprep) of m/s bharat petroleum corporation limited (bpcl)

Spn/b933-000-wb-mr-3123/225 - miscellaneous valves for bina petchem and refinery expansion project (bprep) of m/s bharat petroleum corporation limited (bpcl)

Organisation: Engineers India Limited,MoPNG | Head Office-Delhi,EIL,MoPNG
Start Date: October 15, 2026 22:30
Place: As per bidding document
Read more
Due Date: 17 days left

1. eagle burgmann make complete bare mechanical seal type m3/30 as per ga drawing no. 09-m3/30-g13-,2. supply of m/s eagleburgmann make complete mechanical seal assembly,3. supply of m/s eagle burgmann make mechanical seal type e05d44, as per drawing no a4a8132/a/r2

1. eagle burgmann make complete bare mechanical seal type m3/30 as per ga drawing no. 09-m3/30-g13-,2. supply of m/s eagleburgmann make complete mechanical seal assembly,3. supply of m/s eagle burgmann make mechanical seal type e05d44, as per drawing no a4a8132/a/r2

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: October 13, 2026 15:37
Read more
Due Date: 16 days left

Control valve complete assembly,regulator vacuum assembly,regulator differential assembly,interconnecting bend pipe,installation commissioning and testing of chlorinatior capacity 190 kg per hr

Control valve complete assembly,regulator vacuum assembly,regulator differential assembly,interconnecting bend pipe,installation commissioning and testing of chlorinatior capacity 190 kg per hr

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: October 15, 2026 18:23
Read more
Due Date: 8 days left

Charge output, high temperature, radiation hardened accelerometers.,hardline, mi cable - between 10-32 plug of accelerometer to 10-32 plug of in-line charge amplifier input, with length of 3 meter.,in-line charge converter for accelerometer.,low-noise coaxial cable for radiation hardened accelerometer with blue tfe jacket with length of 22 meter or 75 feet.,tri-axial mounting block along with the studs,pressure sensors,low-noise, coaxial, tfe cable with stranded conductor, with 10-ft length and 10-32 plug on both ends,in-line charge converters for pressure sensor,low-noise, coaxial, with minimum 30-ft length and 10-32 plug to bnc plug ends,data acquisition unit with software,data analysis - processing unit- laptop

Charge output, high temperature, radiation hardened accelerometers.,hardline, mi cable - between 10-32 plug of accelerometer to 10-32 plug of in-line charge amplifier input, with length of 3 meter.,in-line charge converter for accelerometer.,low-noise coaxial cable for radiation hardened accelerometer with blue tfe jacket with length of 22 meter or 75 feet.,tri-axial mounting block along with the studs,pressure sensors,low-noise, coaxial, tfe cable with stranded conductor, with 10-ft length and 10-32 plug on both ends,in-line charge converters for pressure sensor,low-noise, coaxial, with minimum 30-ft length and 10-32 plug to bnc plug ends,data acquisition unit with software,data analysis - processing unit- laptop

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: September 24, 2026 15:09
Read more
Due Date: 10 days left

Preparation of detailed project report (dpr) comprising of technical specification and commercial aspects for establishment of grid connected 29mw ground mounted solar plant at nedunoor (v), thimmapur(m), karimnagar (district) tggenco under captive and sale of power(ppa)

Preparation of detailed project report (dpr) comprising of technical specification and commercial aspects for establishment of grid connected 29mw ground mounted solar plant at nedunoor (v), thimmapur(m), karimnagar (district) tggenco under captive and sale of power(ppa)

Organisation: TELANGANA POWER GENERATION CORPORATION LIMITED-CE- HPC & HYDEL -PROJECTS
Start Date: September 24, 2026 20:30
Place: Telangana
Read more
Due Date: 3 days left

Testing service for on-board /commissioned equipment/ instrument related to plant - chemical diesel generator dg stack emission measurement as per mentioned scope of work and boq nabl labs,testing service for on-board /commissioned equipment/ instrument related to plant - chemical ambient air quality test as per mentioned scope of work and boq nabl labs

Testing service for on-board /commissioned equipment/ instrument related to plant - chemical diesel generator dg stack emission measurement as per mentioned scope of work and boq nabl labs,testing service for on-board /commissioned equipment/ instrument related to plant - chemical ambient air quality test as per mentioned scope of work and boq nabl labs

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: October 06, 2026 20:54
Read more
Due Date: 8 days left

Condenser assembly make kcpl, model c3012 with marine water boxes for chiller,supervision charges for removal of existing condenser from the chiller, installation new condenser

Condenser assembly make kcpl, model c3012 with marine water boxes for chiller,supervision charges for removal of existing condenser from the chiller, installation new condenser

Organisation: NUCLEAR POWER CORPORATION OF INDIA LIMITED | Department of Atomic Energy
Start Date: October 15, 2026 23:27
Read more
Due Date: 17 days left

Procurement of petrofin

Procurement of petrofin

Organisation: IREL (India) Limited | Department of Atomic Energy
Start Date: October 01, 2026 19:14
Read more
Due Date: 3 days left

Need support responding to this opportunity?

Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.

Get Opportunity Matching Support
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise