Railway Construction
Results for: Railway Construction
Find the latest Railway Construction tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Railway Construction e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Organisation: Ministry of Railways
Start Date: July 31, 2026 23:18
Read more
Due Date: 51 days left
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Organisation: Ministry of Railways
Start Date: September 25, 2026 00:52
Read more
Due Date: 1 days left
Construction of hathi passage (overpass ; 55.0 m wide, span 1 x 52.535m composite girder) for movement of elephant at km: 500/15-17 between dhutra and bagdehi in rourkela- jharsuguda section & (overpass; 55.0 m wide, span 1 x 52.36m & 1 x 36.0m composite girder) for movement of elephant at km: 405/5-10 between banspani and jaroli in dangoaposi - jaroli section of odisha state in chakradharpur division in south eastern railway
Construction of hathi passage (overpass ; 55.0 m wide, span 1 x 52.535m composite girder) for movement of elephant at km: 500/15-17 between dhutra and bagdehi in rourkela- jharsuguda section & (overpass; 55.0 m wide, span 1 x 52.36m & 1 x 36.0m composite girder) for movement of elephant at km: 405/5-10 between banspani and jaroli in dangoaposi - jaroli section of odisha state in chakradharpur division in south eastern railway
Organisation: Ministry of Railways
Start Date: October 15, 2026 00:32
Read more
Due Date: 25 days left
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Organisation: Ministry of Railways
Start Date: September 30, 2026 23:36
Read more
Due Date: 31 days left
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Construction of new bg railway line from ch: 273+500 between gyaspurkhedi (including) to ch: 346+162 dr. ambedkar nagar (excluding)(72.66 kms) stations including civil engineering works (earthworks, bridges, viaducts, tunnels, buildings, etc.), track works, signalling & telecommunication works, overhead electrification, electrical general services & all other allied works in connection with manmad to dr. ambedkar nagar (mhow) new bg rail link project in the state of madhya pradesh"
Organisation: Ministry of Railways
Start Date: September 30, 2026 20:28
Read more
Due Date: 122 days left
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Organisation: Ministry of Railways
Start Date: July 31, 2026 00:39
Read more
Due Date: 12 days left
Rfp (request for proposal) for design and construction of major bridges (28 no s) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
Rfp (request for proposal) for design and construction of major bridges (28 no s) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
Organisation: Ministry of Railways
Start Date: August 10, 2026 23:32
Read more
Due Date: 22 days left
Various telecom works in connection with (i) augmentation of existing sse signal store depot at bhusawal (bsl) & manmad (mmr) office and construction of new sse office & store depot at jalgaon(jl) on bsl division. (ii) provision of railnet connectivity at roh depot bhusawal. (iii) provision of telecom facilities at admin building acl/bsl.(iv) provision of internet connectivity at store shed/acl/bsl (v) development of infrastructure and other needs of railway school
Various telecom works in connection with (i) augmentation of existing sse signal store depot at bhusawal (bsl) & manmad (mmr) office and construction of new sse office & store depot at jalgaon(jl) on bsl division. (ii) provision of railnet connectivity at roh depot bhusawal. (iii) provision of telecom facilities at admin building acl/bsl.(iv) provision of internet connectivity at store shed/acl/bsl (v) development of infrastructure and other needs of railway school
Organisation: Ministry of Railways
Start Date: October 08, 2026 18:57
Read more
Due Date: 15 days left
Water hose pipe, 10 mtrs long, suitable [water hose pipe, 10 mtrs long, suitable for high-pressure coach washing applications in railway workshops. hose size/id: 3/8 inch, designed for maximum working pressure of 700 bar and operating temperature range from minus 40 degree celsius to plus 100 degree celsius. hose shall be flexible, robust and heavy-duty construction, manufactured from high-quality oil-resistant synthetic rubber compound having excellent resistance to abrasion, weather, ozone a
Water hose pipe, 10 mtrs long, suitable [water hose pipe, 10 mtrs long, suitable for high-pressure coach washing applications in railway workshops. hose size/id: 3/8 inch, designed for maximum working pressure of 700 bar and operating temperature range from minus 40 degree celsius to plus 100 degree celsius. hose shall be flexible, robust and heavy-duty construction, manufactured from high-quality oil-resistant synthetic rubber compound having excellent resistance to abrasion, weather, ozone a
Organisation: Ministry of Railways
Start Date: October 03, 2026 18:18
Read more
Due Date: 2 days left
Item no. 1
Construction, beautification work of the cremation ground near the railway road flyover.
Tender EMD: 85203
Tender Fee: 3376
Organisation: Directorate of Local Bodies UP | Nagar Palika Parishad Gulawati Bulandshahar
Start Date: October 08, 2026 14:30
Place: Uttar pradesh, npp gulaothi
Read more
Due Date: 3 days left
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Support
Click
Here to Download Dockets
of your Industry type
of your Industry type