Results for: Earth and Stone
Find the latest Earth and Stone tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Earth and Stone e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Hiring of earth moving equipments, material handling equipments and cranes (per hour basis) - as per buyers requirement stone crusher 20 tph minimum capacity stone crusher 20 tph minimum capacity
Hiring of earth moving equipments, material handling equipments and cranes (per hour basis) - as per buyers requirement stone crusher 20 tph minimum capacity stone crusher 20 tph minimum capacity
Mplads - 2026 - 2027 sri. kodikunnil suresh mp - two sides of stone and earth to build a concrete road form mepral - st sebastians church, ward 1 paippad grama panchayat
Mplads - 2026 - 2027 sri. kodikunnil suresh mp - two sides of stone and earth to build a concrete road form mepral - st sebastians church, ward 1 paippad grama panchayat
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Knife double blade,file flat 200,contactor and auxiliary,limit switch,cut out relay,over current relay,undervoltage relay,portable electric drill,load bank,brake test arrangement,earth plate copper plate,earth plate gi plate,earth electrode,rheostat 25 ohm,rheostat 300ohm,rheostat 1 ohm 10 amp,rheostat 10 ohm 5 amp,ohm meter series type,ohm meter shunt type,digital multimeter 3 1by2 digit,ac voltmeter mi,milli voltmeter center zero,ammeter mc analog 0 to 500ma,ammeter mc analog 0 to 5a,ammeter mc analog 0 to 25a,ac ammeter mi 0 to 1 a,ac ammeter mi 0 to 5 a,ac ammeter mi 0 to 25 a,kilo wattmeter analog,digital wattmeter 230v 1kw 50hz,ac energy metersingle phase,power factor meter,frequency meter 45 to 55hz,lux meter lcd,tmeter digital photo,tong tester,megger analog 500,3point dc er,4 point dc er,wheat stone bridge,single phase variable auto transformer,phase sequence indicator,growler 230,ac er registence type er,ac er dol er,ac er star delta er manual,ac er s
Knife double blade,file flat 200,contactor and auxiliary,limit switch,cut out relay,over current relay,undervoltage relay,portable electric drill,load bank,brake test arrangement,earth plate copper plate,earth plate gi plate,earth electrode,rheostat 25 ohm,rheostat 300ohm,rheostat 1 ohm 10 amp,rheostat 10 ohm 5 amp,ohm meter series type,ohm meter shunt type,digital multimeter 3 1by2 digit,ac voltmeter mi,milli voltmeter center zero,ammeter mc analog 0 to 500ma,ammeter mc analog 0 to 5a,ammeter mc analog 0 to 25a,ac ammeter mi 0 to 1 a,ac ammeter mi 0 to 5 a,ac ammeter mi 0 to 25 a,kilo wattmeter analog,digital wattmeter 230v 1kw 50hz,ac energy metersingle phase,power factor meter,frequency meter 45 to 55hz,lux meter lcd,tmeter digital photo,tong tester,megger analog 500,3point dc er,4 point dc er,wheat stone bridge,single phase variable auto transformer,phase sequence indicator,growler 230,ac er registence type er,ac er dol er,ac er star delta er manual,ac er s
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Provding and supplying earth and stone aggregates work for road at village antarwali rathi tq.ghansawangi dist jalna
Provding and supplying earth and stone aggregates work for road at village antarwali rathi tq.ghansawangi dist jalna
Compacted earth for embankment,compacted earth for sub grade and earthen shoulder soil,stone boulde
Compacted earth for embankment,compacted earth for sub grade and earthen shoulder soil,stone boulde
Earthing,earth strip on surface,earth strip in pipe,copper wire on surface,earth bus,red sand stone
π§ Procurement Opportunity: Electrical Earthing Solutions πΏ The Department of Biotechnology (DBT), under the Ministry of Science and Technology, is seeking bids for the supply of electrical earthing solutions, including: π Earth strips on the surface π Earth strips in pipes π Copper wires on the surface π Earth bus Additionally, red sandstone for construction purposes is also required. ποΈ Submission Deadline: May 30, 2024, 12:00 PM Interested bidders should provide detailed proposals, including technical specifications, pricing, and project timelines. Keywords: Electrical Earthing, Earth Strips, Copper Wire, Earth Bus, Red Sand Stone, DBT, Government Procurement, Electrical Materials, Construction Materials
Earth work in excavation,position cement concrete,random rubble stone masonry,pointing on stone mas
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type