Results for: Coal Handling Equipment
Find the latest Coal Handling Equipment tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Coal Handling Equipment e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Bi-ennial maintenance contract for mechanical maintenance of equipment
Bi-ennial maintenance contract for mechanical maintenance of equipmentand fabrication work at coal handling plant of pvunl,patratu
A handling of ash spillage equipment up keeping activities related to plant and other misc jobs b internal cleaning up keeping of boilers coal gas fired leading to cib inspection in sgp cpp c up keeping of short shut down d up keeping of gtg and
A handling of ash spillage equipment up keeping activities related to plant and other misc jobs b internal cleaning up keeping of boilers coal gas fired leading to cib inspection in sgp cpp c up keeping of short shut down d up keeping of gtg and
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Obr work at godavarikhani coal mine (no.2 2a and no.5), rg-i area.
Drilling, excavation, loading, transportation, dumping, spreading levelling, etc., of 722.07 lbcm of in-situ ob (which includes 4.716 lbcm of top soil, 681.686 lbcm of hard ob 35.668 lbcm of coal), excavation of 7.645 lbcm of top soil beneath the external dump and re-handling of 17.578 lcm of loose top soil with conventional equipment and additional works viz., 2000 shovel hours, 1000 dozer hours 3,00,000 rmt of drilling at godavarikhani coal mine (no.2 2a and no.5), rg-i area during a period of 36 months.
🏗️ Invitation for OBR Work at Godavarikhani Coal Mine 🏗️ The Information Technology Electronics and Communication Department of Telangana State invites bids for Open Cast Mine (OBR) work at Godavarikhani Coal Mine (No.2 & 2A, No.5) in the RG-I Area. The scope of work includes drilling, excavation, loading, transportation, dumping, spreading, levelling, and additional works as specified. 📅 Bid Submission Deadline: June 15, 2024, 3:00 PM Tender Fee: INR 29,500 Earnest Money Deposit (EMD): INR 10,00,000 The project encompasses the excavation of 722.07 LBCM of in-situ overburden (including 4.716 LBCM of topsoil and 681.686 LBCM of hard overburden), 35.668 LBCM of coal, and 7.645 LBCM of topsoil beneath the external dump. Additionally, 17.578 LCM of loose topsoil will be re-handled using conventional equipment. The project also includes 2000 shovel hours, 1000 dozer hours, and 3,00,000 RMT of drilling over a period of 36 months. Interested bidders must submit detailed proposals, including method statements, machinery and equipment specifications, and compliance with environmental and safety regulations. Keywords: OBR Work, Godavarikhani Coal Mine,
Repairing work
Repairing/replacement/fabrication work of coal handling spares/ power plant equipment
Primary crusher
Design, engineering, manufacture, supply, supervision of erection, testing, commissioning and conducting performance guarantee tests etc. of 2 sets of double roll crusher alongwith other equipment required on behalf of sms(i) for coal handling
Sdstps
Engaging of earth moving equipment (jcb-1no) for removing of heavy coal boulders / stones from the coal dumped at erhs received by road through tippers from akpl and for miscellaneous works round the clock (excluding diesel cost) for the period of eight months (i.e., from 01.08.2024 to 31.03.2025) in coal handling plant stagei sdstps
Tggenco-ktpp
Tggenco-ktpp-chp - mm - providing the services of maintenance and incidental work of coal handling plant equipment pertaining to sd-i sub division/mm-i division, fuels-ii sub division/mm-ii division/chp for the period from 01.04.2025 to 31.03.2026
Btps-tsgenco
Btps - chp - regular maintenance and minor repair work of mechanical equipment of stacker cum reclaimer-1 pertaining to mechanical maintenance-iv sub division of coal handling plant, btps as and when required for the period from 01.04.2024 or from actual date of commencement of work to 31.03.2025
Ytps
Tggenco ytps chp mmii complete mechanical maintenance of wagon tippler 3 and 4, sidearmchargers 3 and 4, apron feeders, dribble conveyors, track hopper 2,paddle feeders, stacker 2 and 3,reclaimer2,sump pumps, compressors and connected equipment of stage ii in coal handling plant in priority path of stage ii ytps 5x800mw from 01 04 2026 or actual date of commencement to 61 days
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type