Results for: Chilled Water Piping
Find the latest Chilled Water Piping tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Chilled Water Piping e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Repair/replacement of condenser and chilled water piping, cooling tower, ahu and allied works at airport express line.
Repair/replacement of condenser and chilled water piping, cooling tower, ahu and allied works at airport express line.
Opn and comp. maintenance of various of ems service,sitc of nominal sizes of chilled water piping a
Rerouting of insulated chilled water piping comprising supply installation testing and commissioning of insulated chilled water airconditioning piping and valves towards a b and c block buildings at tifr colaba, mumbai
Rerouting of insulated chilled water piping comprising supply installation testing and commissioning of insulated chilled water airconditioning piping and valves towards a b and c block buildings at tifr colaba, mumbai
Provision of nitrile rubber insulation and glass cloth covering of air-conditioning ducts and chilled water piping at ciab building
Provision of nitrile rubber insulation and glass cloth covering of air-conditioning ducts and chilled water piping at ciab building
🏢 Procurement Opportunity: Nitrile Rubber Insulation and Glass Cloth Covering 🌿💧 The Department of Biotechnology, under the Central Government's Ministry/Department, is seeking bids for the provision of nitrile rubber insulation and glass cloth covering for air-conditioning ducts and chilled water piping at the CIAB building in Mohali. 📅 Bid Submission Deadline: July 17, 2024, 3:00 PM Tender Fee: INR 1 EMD: INR 6300 Interested bidders must provide detailed technical and financial proposals, including compliance with safety standards and environmental regulations. This project requires expertise in insulation and covering solutions for HVAC systems. Keywords: Nitrile Rubber Insulation, Glass Cloth Covering, HVAC Ducts, Chilled Water Piping, CIAB Building, Department of Biotechnology, Government Tender, Mohali
Supply, erection and testing of chilled water piping from central water chilling plant to core sub assembly plant at frfcf site, kalpakkam
Supply, erection and testing of chilled water piping from central water chilling plant to core sub assembly plant at frfcf site, kalpakkam
Chiller and chilled water piping network and oandm in ventilation system npcil/ kk 3 and 4/ o and m/operation/pt/2024/161
Chiller and chilled water piping network and oandm in ventilation system for new fuel storage building ufc of kk 3to6
Chemical based waterproofing treatment to roof terrace and refurbishing of insulation surfaces for chilled water piping system at rlg building, barc, trombay, mumbai 85
Chemical based waterproofing treatment to roof terrace and refurbishing of insulation surfaces for chilled water piping system at rlg building, barc, trombay, mumbai-85
Re routing of chilled water piping comprising supply installation testing and commissioning of insulated chilled water air conditioning pipe and valves towards a b and c block buildings at tifr colaba mumbai 400005
Re routing of chilled water piping comprising supply installation testing and commissioning of insulated chilled water air conditioning pipe and valves towards a b and c block buildings at tifr colaba mumbai 400005
Operation and comprehensive maintenance of 300 tr hvac system consisting of 3 air cooled screws chillers make climaveneta of 100 tr each chilled water pumps ahus chilled water piping with all the valves ducting electrical panels vfd panel
Operation and comprehensive maintenance of 300 tr hvac system consisting of 3 air cooled screws chillers make climaveneta of 100 tr each chilled water pumps ahus chilled water piping with all the valves ducting electrical panels vfd panel
Sitc of high wall fan coil units 7 x 2.0 tr 4 x 1.5 tr capacity with chilled water piping and associated works in mpaes lab at wl 116
Sitc of high wall fan coil units 7 x 2.0 tr 4 x 1.5 tr capacity with chilled water piping and associated works in mpaes lab at wl 116
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type