Tender Details
Particulars | Details |
---|---|
Title |
Four Leg Polyester Webbing Sling Of Each Leg 2 Ton Capacity X04 Mtr Length And Swl 3 Ton
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106548388 |
Reference Number |
65245779 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106548388/viewNitPdf_4799762.pdf |
Start Date | December 09, 2024 19:39 |
End Date |
18/12/2024 ( Expired 146 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreTender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreCustom bid for services - hiring of truck carrying capacity four point five ton at coach care centr
Read more
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreof your Industry type