Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Filling Behind Cc Lining Slabs In Between Rd 23133 M To Rd 27404 M On Both Sides Of Mhc I By Coarse Sand Grouting During The Year 2025 26
|
Description |
Filling Behind Cc Lining Slabs In Between Rd 23133 M To Rd 27404 M On Both Sides Of Mhc I By Coarse Sand Grouting During The Year 2025 26
|
Organisation | Department of Power | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2094 |
EMD | 15484 |
Tender Value | |
Place | Talwara |
Link |
AAAAAAAAAA Login to view |
Start Date | July 07, 2025 18:45 |
End Date |
21/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Jjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Read moreRestoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Restoration of damaged slabs of concrete lining of ubdc hydel channel from rd 0ft to rd 40000ft on both banks during closure of ubdc hydel channel during 2025-26
Read moreTtps es circle em i annual maintenance of transformers and generator bus duct in unit iii during the annual overhauling for the year 2025 26
Ttps es circle em i annual maintenance of transformers and generator bus duct in unit iii during the annual overhauling for the year 2025 26
Read moreTtps es circle em i annual maintenance of h t motors of boiler feed pump a b c main condensate pump a b c and starting oil pump in unit iii during the annual overhauling for the year 2025 26
Ttps es circle em i annual maintenance of h t motors of boiler feed pump a b c main condensate pump a b c and starting oil pump in unit iii during the annual overhauling for the year 2025 26
Read moreTggenco-cetd-div-i- supply of course material to the assistant engineers (elect, mechl telecom) for conducting induction training programme at cetd during the year 2025-26
Tggenco-cetd-div-i- supply of course material to the assistant engineers (elect, mechl and telecom) for conducting induction training programme at cetd during the year 2025-26
Read moreMtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).
Mtc of road from jirania block complex near old ps to mandwi road via vidyasagar colony during the year 2025-26 sh patch metalling, grouting, patch carpeting and other allied works. (l 2.10 km, ch.0.00 km to ch.2.10 km).
Read moreUws schemes / sh- mtc., repairng diffrnt dia. c.i./d.i./p.v.c. piplines in/c repair, re-construction of s/v, s/v chambers, other allied works undr dws sd-i, udp, gomati district during the year 2025-26.
Uws schemes / sh- mtc., repairng diffrnt dia. c.i./d.i./p.v.c. piplines in/c repair, re-construction of s/v, s/v chambers, other allied works undr dws sd-i, udp, gomati district during the year 2025-26.
Read moreEmergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Read moreRestoration of damaged cc lining slabs in between rd 2975 m to rd 3800 m on both sides of mhc-ii during the year 2025-26
Restoration of damaged cc lining slabs in between rd 2975 m to rd 3800 m on both sides of mhc-ii during the year 2025-26
Read moreFilling behind cc lining slabs in between rd 23133 m to rd 27404 m on both sides of mhc-i by coarse sand grouting during the year 2025-26
Filling behind cc lining slabs in between rd 23133 m to rd 27404 m on both sides of mhc-i by coarse sand grouting during the year 2025-26
Read moreof your Industry type