Tender Details
Particulars | Details |
---|---|
Title |
Aluminimum Alloy Rod 28.50+ / 0.3 Mm Dia In Straight Length Of 2 To 3 Mtrs. Specn. Bs 1474 1987 Desi
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2025/B/6184751 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 30, 2025 22:25 |
End Date |
21/05/2025 ( Expired 19 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreMaintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh
Maintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreSupply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Supply of m.s. e.r.w black and plain ended m.s. casing pipe as per is 4270 (01) in random length of 04 m to 7m or 6m in following dia. size 175mm x 5.4mm thick file no. 167/25x9/1
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreof your Industry type