Redressing Repairing Of Drains And Vents Valve Of Final Super Heater Main Steam Line Pri Sh Back Pass Boiler Drum And Other Similar Valve During Overhauling Of Unit No 5 Of 2x500 Mw Btps Anpara
|
Description |
Redressing Repairing Of Drains And Vents Valve Of Final Super Heater Main Steam Line Pri Sh Back Pass Boiler Drum And Other Similar Valve During Overhauling Of Unit No 5 Of 2x500 Mw Btps Anpara
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_RVUNL_814775_1 |
Reference Number |
T-05/BMD-I/BTPS/2023-24 |
Tender Fee | 590 |
EMD | 5500 |
Tender Value | |
Place | Office of Superintending Engineer O and MC II BTPS |
Link | https://etender.up.nic.in |
Start Date | June 24, 2023 14:30 |
End Date |
01/08/2023 ( Expired 650 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification/repairing and reconditioning of different size of valves valve spares, repairing of valve blocks, fabrication of adapter below eco hopper and machining of super heater drain valves etc. during capital overhauling of boiler of u6
Rectification/repairing and reconditioning of different size of valves valve spares, repairing of valve blocks, fabrication of adapter below eco hopper and machining of super heater drain valves etc. during capital overhauling of boiler of u6
Read moreErosion protection shield and clamp suitable for back pass super heater front tubes, low temperature super heater ltsh coil tubes for 600mw boiler of unit-i
Erosion protection shield and clamp suitable for back pass super heater front tubes, low temperature super heater ltsh coil tubes for 600mw boiler of unit-i&#x0d
Read moreWork of seat cutting/ repair/ machining / material build in drum, ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit-2 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia
Work of seat cutting/ repair/ machining / material build in drum, ms line (super heater) and hrh and crh line safety valves installed at the boiler of unit-2 at 2x600 mw units, sstpp, stage-i, mppgcl, dongalia
Read moreDeployment of expert persons for third party inspection of quality and quantity of boiler pressure part and air preheater works during annual overhauling of unit no 5 500mw btps anpara
Deployment of expert persons for third party inspection of quality and quantity of boiler pressure part and air preheater works during annual overhauling of unit no 5 500mw btps anpara
Read moreOverhauling of primary and secondary air pre heater of unit no 5
Overhauling of primary and secondary air pre heater of unit no 5&#x0d of 2x500 mw btps anpara&#x0d
Read moreTtps mechii bm unit i boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 20242025 overhaul
Ttps mechii bm unit i boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 20242025 overhaul
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 2024 2025 overhaul
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 2024 2025 overhaul
Read moreSupply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. of unit no. 7, 2x500 mw, dtps, anpara.
Supply and application of thermal insulation on critical steam pipes such as main steam hot reheat, cold reheat, cross around and feed cycles pipes etc. &#x0d of unit no. 7, 2x500 mw, dtps, anpara.&#x0d
Read moreTtps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes economizer coils etc during overhaul for the year
Ttps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes economizer coils etc during overhaul for the year
Read moreTtps mech ii bm unit iv drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit iv boiler during overhaul for the year 2024 202
Ttps mech ii bm unit iv drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit iv boiler during overhaul for the year 2024 202
Read moreof your Industry type