Tender Details
About Tender
🔬 Procurement Opportunity: Specialised Services For Resg Facilities 🔬 The Indira Gandhi Centre For Atomic Research (Igcar), Under The Ministry Of Science & Technology, Invites Bids For Specialized Services Related To Radiological Activities, Non Destructive Testing (Ndt) Works, Environmental Sample Collection, Analysis, And Conducting Experiments Across Various Facilities Within Igcar. 📅 Bid Submission Deadline: April 16, 2024, 3:30 Pm A Tender Fee Of Inr 11,171.50 Has Been Set For The Expression Of Interest (Eo I). Interested Parties Should Submit Detailed Proposals, Including Methodologies, Timelines, And Compliance With Safety And Environmental Regulations. Keywords: Radiological Activities, Ndt Works, Environmental Sampling, Analysis, Experiments, Igcar, Central Government, Atomic Research, Procurement, Specialised Services, Eo I, Tender FeeParticulars | Details |
---|---|
Title |
Work Related To Radiological Activities, Ndt Works, Environmental Sample Collection, Analysis And Conducting Experiments In Various Facilities Of Resg
|
Description |
Work Related To Radiological Activities, Ndt Works, Environmental Sample Collection, Analysis And Conducting Experiments In Various Facilities Of Resg
|
Organisation | Indira Gandhi Centre for Atomic Research | Central Govt. Ministry/Department |
Tender Id | 2024_IGCAR_802375_1 |
Reference Number |
IGC/TS/MISC/2024/14272 |
Tender Fee | 0 |
EMD | 1.12 Lakh |
Tender Value | |
Place | IGCAR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=843419 |
Start Date | April 10, 2024 21:00 |
End Date |
16/04/2024 ( Expired 418 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read more80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj
80246 completion of incomplete works in respect of ca no. ce(cg).viz.fraz. 19 of 2023.24. provn of hoverport and allied facilities at icgs frazerganj
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreof your Industry type