Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Malupura Link Road In Km. 1, 2(700)
|
| Description |
Reconstruction Of Malupura Link Road In Km. 1, 2(700)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEJNS_844356_2 |
|
Reference Number |
3607/10A Dt. 20.09.2023 |
| Tender Fee | 856 |
| EMD | 1.41 Lakh |
| Tender Value | |
| Place | EE PD PWD ORAI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 29, 2023 19:30 |
| End Date |
Expired
05/10/2023
Expired 996 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read more01/ee/2026-27 reconstruction of vrb at km. 1.030 of nagla akkhu drain in distt. ghaziabad (lot-4)
01/ee/2026-27 reconstruction of vrb at km. 1.030 of nagla akkhu drain in distt. ghaziabad (lot-4)
Read moreWidening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Widening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Read moreRepairing of link road nevilgang bhadurpur road to nagla vidhi
Repairing of link road nevilgang bhadurpur road to nagla vidhi
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreGeneral budget w o r k 2 0 1 7 2 0 1 8 improvements tokaruvatta thatta mamoodu road working chainage from ch 0 00 3 578 balance work in karuvatta thatta mammoodu road general civil work
General budget w o r k 2 0 1 7 2 0 1 8 improvements tokaruvatta thatta mamoodu road working chainage from ch 0 00 3 578 balance work in karuvatta thatta mammoodu road general civil work
Read moreof your Industry type