Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Overhauling Kit For Drain Valve (Kbi Part No.182281) Of Electric Ccb For 3 Phase Locomotives
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106510920 |
Reference Number |
GE241191 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106510920/viewNitPdf_4757134.pdf |
Start Date | October 28, 2024 16:41 |
End Date |
04/11/2024 ( Expired 246 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreComplete overhauling of 6.6 kv various capacities motors (17 nos.) of unit no. 3 of 3x210 mw, atps, anpara
Complete overhauling of 6.6 kv various capacities motors (17 nos.) of unit no. 3 of 3x210 mw, atps, anpara
Read moreHiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.
Hiring services of one no. brand new mahindra scorpio classic s 2wd bs6 2.0 model base model with driver and all fittings and accessories for a period of 4 years for telecom and instrumentation section, pump station 3, jorhat.
Read moreProcurement of seals of hag for bowl mill xrp-903 installed at 2x250mw,dtps for overhauling of unit no 9,dtps, htps
Procurement of seals of hag for bowl mill xrp-903 installed at 2x250mw,dtps for overhauling of unit no 9,dtps, htps
Read moreUnder infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Under infrastructure fund talpura road housing development scheme in jhansi district repair strengthening work of roads in jhansi rcc drain construction work behind paramedical boundary wall in nagar nigam jhansi mauja scheme no 3 road strengthening
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreManufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreAnnual overhauling of coal pipe for 3 no. units of 210 mw capacity at ggsstp, ropar.
Annual overhauling of coal pipe for 3 no. units of 210 mw capacity at ggsstp, ropar.
Read moreProcurement of spares of esp hopper fluidizing pad and plenum plate for ash intake valve installed in ash handling system of unit no. 10 and 11 of stps, sarni.
Procurement of spares of esp hopper fluidizing pad and plenum plate for ash intake valve installed in ash handling system of unit no. 10 and 11 of stps, sarni.
Read moreof your Industry type