Tender Details

Particulars Details
Title
For Removal Of Deposited Earth In Main Canal Ch. 348 To 358 And Ch. 630 To 650 And Left Side Bank Raising Repair Work
Description
For Removal Of Deposited Earth In Main Canal Ch. 348 To 358 And Ch. 630 To 650 And Left Side Bank Raising Repair Work
Organisation Engineer-in-Chief - Water Resources Department | State Govt. and UT
Tender Id 2025_WRD_414462_1
Reference
Number
2025_WRD_414462
Tender Fee 2295
EMD 8500
Tender Value
Place WAINGANGA MAIN CANAL
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=496383
Start Date May 09, 2025 16:00
End Date

16/05/2025 ( Expired 13 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

S and s of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 680 zero considered at lapcha on pt 4840 high ground bargiok lapcha rd under 108 rcc 759 brtf sector of project dpk in hp

Read more
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)

Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.

Read more
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).

Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise