Tender Details

Particulars Details
Title
Reconstruction Of Surplus Weir At Manapet Thangal Near Kanniyakoil In Bahour Commune, Puducherry.
Description
Reconstruction Of Surplus Weir At Manapet Thangal Near Kanniyakoil In Bahour Commune, Puducherry.
Organisation Public Works Department | State Govt. and UT
Tender Id 2025_PWDC2_18562_1
Reference
Number
TN.12/PW/IRRN/2025-2026
Tender Fee 1050
EMD 2.74 Lakh
Tender Value -
Place Puducherry
Link
View Original Tender Notice

https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18903

Start Date May 16, 2025 18:45
End Date
Expired 05/06/2025

Expired 496 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Urgent desilting work at bahour tank seliamedu sluice (c2-2) channel from d/s of main road culvert upto seliamedupet village in bahour commune, puducherry.

Urgent desilting work at bahour tank seliamedu sluice (c2-2) channel from d/s of main road culvert upto seliamedupet village in bahour commune, puducherry.

Read more
Special repair to surplus weir of eluvaraimukki tank in eluvaraimukki villagae of sathankulam taluk in thoothukudi district

Special repair to surplus weir of eluvaraimukki tank in eluvaraimukki villagae of sathankulam taluk in thoothukudi district

Read more
Reconstruction of siruvadi tank weir in marakkanam taluk of villupuram district

Reconstruction of siruvadi tank weir in marakkanam taluk of villupuram district

Read more
Emergency repairs to balancing weir in surplus channel of pedda cheruvu in manakondur(v), manakondur (m), karimnagar (d).

Emergency repairs to balancing weir in surplus channel of pedda cheruvu in manakondur(v), manakondur (m), karimnagar (d).

Read more
Special repairs to sengadu big tank weir and desilting of surplus channel in cheyyar taluk of tiruvannamalai district

Special repairs to sengadu big tank weir and desilting of surplus channel in cheyyar taluk of tiruvannamalai district

Read more
Desilting the thiruvandarkoil tank surplus channel from thirubuvanai electricity sub-station to ural kulam (opp. to fci godown) thiruvandarkoil, mannadipet commune, puducherry.

Desilting the thiruvandarkoil tank surplus channel from thirubuvanai electricity sub-station to ural kulam (opp. to fci godown) thiruvandarkoil, mannadipet commune, puducherry.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Cleaning the bahour tank surplus course from surplus weir to pannithittu tail end regulator in bahour commune, puducherry for the year 2023-2024.

Cleaning the bahour tank surplus course from surplus weir to pannithittu tail end regulator in bahour commune, puducherry for the year 2023-2024.

Read more
Construction of single lane bridge across bahour surplus weir and formation of tank bund road around bahour tank in bahour revenue village, bahour commune, puducherry.

Construction of single lane bridge across bahour surplus weir and formation of tank bund road around bahour tank in bahour revenue village, bahour commune, puducherry.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise