Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Of Surplus Weir At Manapet Thangal Near Kanniyakoil In Bahour Commune, Puducherry.
|
| Description |
Reconstruction Of Surplus Weir At Manapet Thangal Near Kanniyakoil In Bahour Commune, Puducherry.
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2025_PWDC2_18562_1 |
|
Reference Number |
TN.12/PW/IRRN/2025-2026 |
| Tender Fee | 1050 |
| EMD | 2.74 Lakh |
| Tender Value | - |
| Place | Puducherry |
| Link |
View Original Tender Notice
https://pudutenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=18903 |
| Start Date | May 16, 2025 18:45 |
| End Date |
Expired
05/06/2025
Expired 496 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Urgent desilting work at bahour tank seliamedu sluice (c2-2) channel from d/s of main road culvert upto seliamedupet village in bahour commune, puducherry.
Urgent desilting work at bahour tank seliamedu sluice (c2-2) channel from d/s of main road culvert upto seliamedupet village in bahour commune, puducherry.
Read moreSpecial repair to surplus weir of eluvaraimukki tank in eluvaraimukki villagae of sathankulam taluk in thoothukudi district
Special repair to surplus weir of eluvaraimukki tank in eluvaraimukki villagae of sathankulam taluk in thoothukudi district
Read moreReconstruction of siruvadi tank weir in marakkanam taluk of villupuram district
Reconstruction of siruvadi tank weir in marakkanam taluk of villupuram district
Read moreEmergency repairs to balancing weir in surplus channel of pedda cheruvu in manakondur(v), manakondur (m), karimnagar (d).
Emergency repairs to balancing weir in surplus channel of pedda cheruvu in manakondur(v), manakondur (m), karimnagar (d).
Read moreSpecial repairs to sengadu big tank weir and desilting of surplus channel in cheyyar taluk of tiruvannamalai district
Special repairs to sengadu big tank weir and desilting of surplus channel in cheyyar taluk of tiruvannamalai district
Read moreDesilting the thiruvandarkoil tank surplus channel from thirubuvanai electricity sub-station to ural kulam (opp. to fci godown) thiruvandarkoil, mannadipet commune, puducherry.
Desilting the thiruvandarkoil tank surplus channel from thirubuvanai electricity sub-station to ural kulam (opp. to fci godown) thiruvandarkoil, mannadipet commune, puducherry.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreCleaning the bahour tank surplus course from surplus weir to pannithittu tail end regulator in bahour commune, puducherry for the year 2023-2024.
Cleaning the bahour tank surplus course from surplus weir to pannithittu tail end regulator in bahour commune, puducherry for the year 2023-2024.
Read moreConstruction of single lane bridge across bahour surplus weir and formation of tank bund road around bahour tank in bahour revenue village, bahour commune, puducherry.
Construction of single lane bridge across bahour surplus weir and formation of tank bund road around bahour tank in bahour revenue village, bahour commune, puducherry.
Read moreof your Industry type