Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Operation Of Ac System At Annabhau Sathe Auditorium In Campus Of V.J.B. Udyan For The Period Of One Year.
|
| Description |
Operation Of Ac System At Annabhau Sathe Auditorium In Campus Of V.J.B. Udyan For The Period Of One Year.
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2025_MCGM_1200675_1 |
|
Reference Number |
DY CH ENGG M E /830/ CITY DT.14.07.2025 |
| Tender Fee | 4784 |
| EMD | 18100 |
| Tender Value | - |
| Place | Municipal Workshop |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2080370 |
| Start Date | July 18, 2025 16:30 |
| End Date |
Expired
24/07/2025
Expired 445 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Comprehensive house keeping, operation and maintenance services contract (for 3 years) for urja auditorium building along with entire amenities and campus at bsphcl colony, punaichak , patna, bihar.
Comprehensive house keeping, operation and maintenance services contract (for 3 years) for urja auditorium building along with entire amenities and campus at bsphcl colony, punaichak , patna, bihar.
Read moreDevelopment, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Development, operation and maintenance of ropeway and glass bridge skywalk at bhadrakali lake on dbfot mode for a period of 30 years
Read moreManning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Manning,operation and maintenance of ph-iii 150 mld water treatment plant at peddapur for the period of one year under peddapur section, sd-ii peddapur, transmission division-ii, patancheru.
Read moreWork descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Work descriptions: remaining work of rejuvenation of bhairva talab in bhagalpur, bihar including 5 years of defect liability period and operation & maintenance under bhagalpur smart city limited, on engineering, procurement & construction (epc) contract basis.
Read moreOperation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Operation and maintenance of kslisp stage-i pumping station at nagireddypally (v), narva (m) and stage-ii pumping station at teelair (v), marikal (m), narayanpet district for the period of three years from 11.11.2026 to 10.11.2029.
Read moreSitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Sitc of transformer (750 kva), ht & lt panel and cable, apfc (capacitor) panel, wiring and shifting of existing 320 kva dg at new s/s beside the cm secretariat, along with operation & maintenance for five years in the campus of 4 no. deshratan marg (4 kga), patna, bihar
Read moreOperation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary
Operation of piped water supply schemes by deploying pump operators and payment of electricity charges and comprehensive operation and maintenance, routine repairs and special repairs of rural piped water supply scheme (pws) and ward level piped water supply schemes in non quality affected wards (wls_non quality) i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, staff quarters, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read morePart i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electr
Part i: fixed operation of ward level piped water supply schemes (nq/ q affected/pws) by deploying pump operators and payment of electricity charges and part ii: variable comprehensive maintenance of ward level water supply schemes (nq/ q affected/pws), i/c the cost of chemicals, cleaning of esr and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new fhtcs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of engineer-in-charge. in different block in darbhanga. fy-26-27 no. of schemes: -60 wls(non quality):- 26 wls(quality): - 16 pws : -18
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreof your Industry type