| Particulars | Details |
|---|---|
| Title |
Providing, Installation, Testing And Commissioning Of Gas Chlorinator Plant At 25 Mld Wtp Sahwa District Churu Including 5 Years O And M On Single Responsibility Output Performance Contract Basis Along With Consumable Items
|
| Description |
Providing, Installation, Testing And Commissioning Of Gas Chlorinator Plant At 25 Mld Wtp Sahwa District Churu Including 5 Years O And M On Single Responsibility Output Performance Contract Basis Along With Consumable Items
|
| Organisation | PHED-Chief Engineer(SP and EAP), Jaipur | State Govt. and UT |
| Tender Id | 2024_PHCJ_438383_1 |
|
Reference Number |
07/2024-25 ACE (P) PHED Churu |
| Tender Fee | 7000 |
| EMD | 4.69 Lakh |
| Tender Value | - |
| Place | Sahwa |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787789 |
| Start Date | December 30, 2024 16:30 |
| End Date |
Expired
09/01/2025
Expired 644 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Periodic hydro testing and maintenance of tonners as per gas cylinder rules, 2016 disinfection of drinking water by safe and secure mode at wtp plant of uwss udaipur titardi on output performance basis for 02 years.
Periodic hydro testing and maintenance of tonners as per gas cylinder rules, 2016 and disinfection of drinking water by safe and secure mode at wtp plant of uwss udaipur titardi on output performance basis for 02 years.
Read moreNail file,neck tray,re-bonding boards,vacuum suction,divider spring,growler,function generator,immersion heater,inverter 1 kva,plane smoothing,soldering iron copper bit,cut out relays,,reverse current relays,motor ac single phase 230 v,transformer single phase, 1 kva, 240 and 415v 50 hz core type, air cooled .,stepper motor with digital control,shaded pole motor fractional hp,,wiring board on stand 3 meters x 1meter,hammer extractor type,caliper inside spring,drill hand brace,ac starter resistance type starter,star delta strater soft starter,soldering iron,led lighting system measurement of power, voltage, current, power factor and light output performance of different lighting products like led,,ventilation system,spanners ,clyburn,measuring tape,thread cutter,hammer sledge,multi angle magnetic clamp set,anvil 24 sq. inches working area with stand,solid state solar base single phase energy meter,wall jumper octagonal,coil winding machine,earth copper plate,safety belt with,rubber gloves,solar charge controll
Nail file,neck tray,re-bonding boards,vacuum suction,divider spring,growler,function generator,immersion heater,inverter 1 kva,plane smoothing,soldering iron copper bit,cut out relays,,reverse current relays,motor ac single phase 230 v,transformer single phase, 1 kva, 240 and 415v 50 hz core type, air cooled .,stepper motor with digital control,shaded pole motor fractional hp,,wiring board on stand 3 meters x 1meter,hammer extractor type,caliper inside spring,drill hand brace,ac starter resistance type starter,star delta strater soft starter,soldering iron,led lighting system measurement of power, voltage, current, power factor and light output performance of different lighting products like led,,ventilation system,spanners ,clyburn,measuring tape,thread cutter,hammer sledge,multi angle magnetic clamp set,anvil 24 sq. inches working area with stand,solid state solar base single phase energy meter,wall jumper octagonal,coil winding machine,earth copper plate,safety belt with,rubber gloves,solar charge controll
Read moreProviding, installation, testing and commissioning of gas-chlorinator plant at 60 mld wtp karamsana district hanumangarh including 5 years o and m on single responsibility output performance contract basis along with consumable items
Providing, installation, testing and commissioning of gas-chlorinator plant at 60 mld wtp karamsana district hanumangarh including 5 years o and m on single responsibility output performance contract basis along with consumable items
Read moreProviding installation testing and commissioning of gas chlorinator at wtp plant for uwss udaipur doodh talai including 5 years o and m on single responsibility output performance contract basis along with consumable items
Providing installation testing and commissioning of gas chlorinator at wtp plant for uwss udaipur doodh talai including 5 years o and m on single responsibility output performance contract basis along with consumable items
Read moreAnnual maintenance contract for 2 nos. vacuum gas chlorinator installed at 12 mld and 30 mld wtp for 3 years
Annual maintenance contract for 2 nos. vacuum gas chlorinator installed at 12 mld and 30 mld wtp for 3 years
Read moreOperation and maintenance of 192 mld plant world bank pump house, recycle pump house, cph, 33 kv gss, 64 mld wtp unit i,ii and iii (with chlorinator) at akelgarh head works kota for 05 years.
Operation and maintenance of 192 mld plant world bank pump house, recycle pump house, cph, 33 kv gss, 64 mld wtp unit i,ii and iii (with chlorinator) at akelgarh head works kota for 05 years.
Read moreRejuvenation modernization and strengthening of water treatment plant of 13.52 mld at doodhtalai uwss udaipur including twelve months defect liability period on single point responsibility basis
Rejuvenation modernization and strengthening of water treatment plant of 13.52 mld at doodhtalai uwss udaipur including twelve months defect liability period on single point responsibility basis
Read moreDisinfection of drinking water by safe and secure mode with filter plant for 7.8 mld rgf at ska dam on output performance basis including supply of consumable items for 18 months under division sagwara nit 09/2025-26
Disinfection of drinking water by safe and secure mode with filter plant for 7.8 mld rgf at ska dam on output performance basis including supply of consumable items for 18 months under division sagwara nit 09/2025-26
Read moreRejuvenation modernization and strengthening of water treatment plant of 13.52 mld at doodh talai uwss udaipur, including twelve months defect liability period on single point responsibility basis
Rejuvenation modernization and strengthening of water treatment plant of 13.52 mld at doodh talai uwss udaipur, including twelve months defect liability period on single point responsibility basis
Read moreOperation and maintenance of disinfection work with filter plant including supply of consumable items for 15 months at uwss dungarpur at udayvilash filter plant on output performance basis
Operation and maintenance of disinfection work with filter plant including supply of consumable items for 15 months at uwss dungarpur at udayvilash filter plant on output performance basis
Read moreof your Industry type