Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Of Structural Items, Fabrication And Erection Of Structural Support Of Riser Pipe In The Mct Area, Petro Uc
|
Description |
Supply Of Structural Items, Fabrication And Erection Of Structural Support Of Riser Pipe In The Mct Area, Petro Uc
|
Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 12000 |
Tender Value | |
Place | Udyogamandal |
Link |
AAAAAAAAAA Login to view |
Start Date | June 14, 2025 19:30 |
End Date |
30/06/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreEoi for selection of service provider for supply, development, installation, integration, migration, maintenance and support of insurance management solution (ims) to department of posts
Eoi for selection of service provider for supply, development, installation, integration, migration, maintenance and support of insurance management solution (ims) to department of posts
Read moreDesign, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Read moreProvision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur
Provision of gas godown and connected infrastructure for vayu sena gas agency and provn of iron grill cover water tanks ph i in domestic area at afs tezpur 
 
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreSupply and construction of pre-engineered modular earth covered magazine (5 mt) in 2 mtn div aor
Supply and construction of pre-engineered modular earth covered magazine (5 mt) in 2 mtn div aor
Read moreConstruction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreof your Industry type