Tender Details
About Tender
๐๏ธ Construction Opportunity: Shiv Dham Phase I, Kangnidhar, Mandi, Himachal Pradesh ๐๏ธ The Himachal Pradesh Tourism Development Corporation, A State Government Undertaking, Is Calling For Tenders For The Construction Of The Remaining Work Of Shiv Dham Phase I At Kangnidhar, Mandi District, Himachal Pradesh. ๐ ๏ธ ๐๏ธ Scope Of Work: Structural Construction Of A Replica Of 12 Jyotirlings Site Development Approach Road Construction ๐ Bid Submission Deadline: April 18, 2024, 11:00 Am ๐ธ Tender Fee: Inr 10,000 ๐ฒ Earnest Money Deposit (Emd): Inr 48,42,000 Interested Contractors Must Submit Detailed Tenders, Including Technical And Financial Bids, In Accordance With The Specifications Provided In The Tender Document. Keywords: Construction, Shiv Dham Phase I, Himachal Pradesh Tourism Development Corporation, State Government, Ut, Jyotirlings, Site Development, Approach Road, Tender, EmdParticulars | Details |
---|---|
Title |
Construction Of Remaining Work Of Shiv Dham (Phase I) At Kangnidhar, Mandi Distt. Mandi H.P Sub Head Structural Construction Of Replica Of 12 Jyotirlings Site Development And Approach Road.
|
Description |
Construction Of Remaining Work Of Shiv Dham (Phase I) At Kangnidhar, Mandi Distt. Mandi H.P Sub Head Structural Construction Of Replica Of 12 Jyotirlings Site Development And Approach Road.
|
Organisation | Himachal Pradesh Tourism Development Corporation | State Govt. and UT |
Tender Id | 2024_HPTDC_88435_1 |
Reference Number |
Proj./4-165/2019-Vol-I |
Tender Fee | 10000 |
EMD | 31.45 Lakh |
Tender Value | |
Place | Kangnidhar Mandi Himachal Pradesh |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=147235 |
Start Date | February 15, 2025 22:30 |
End Date |
05/03/2025 ( Expired 71 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Read moreSupply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Supply and stacking of various materials for construction of approach road at km 121.730, km 127.270 and km 156.120 on sairang-tuipuibari road for permanent and surf work like gsb, wbm, dbm and bc work under project pushpak in mizoram state
Read moreProcess piping, structural steel and equipment erection work of ventilation system for oesc building at taps-3 and 4 site.
Process piping, structural steel and equipment erection work of ventilation system for oesc building at taps-3 and 4 site.
Read moreCleaning and conservation of ancient water tank (phase-ii) at shiv temple at neelkanth dist. alwar (complete work)
Cleaning and conservation of ancient water tank (phase-ii) at shiv temple at neelkanth dist. alwar (complete work)
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreof your Industry type