Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Of Profile Sheets Along With Other Works For Maintenance Workshed Of Chinchpokli Garage Under Ex. Eng. (Tr.) Wssd Section.
|
Description |
Providing And Fixing Of Profile Sheets Along With Other Works For Maintenance Workshed Of Chinchpokli Garage Under Ex. Eng. (Tr.) Wssd Section.
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2025_MCGM_1162589_1 |
Reference Number |
2025/Q/CHP/MAINTENANCE SHEDS PROFILE SHEET |
Tender Fee | 890 |
EMD | 3000 |
Tender Value | |
Place | Byculla Mumbai |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2021363 |
Start Date | March 19, 2025 20:30 |
End Date |
24/03/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreEmpanelment of agencies for implementing maintenance works to be taken up on risk and cost of the concessionaire/contractor under the jurisdiction of ro-madurai
Empanelment of agencies for implementing maintenance works to be taken up on risk and cost of the concessionaire/contractor under the jurisdiction of ro-madurai
Read moreRfq-2025 for the maintenance works to be taken up on risk and cost of the concessionaire / contractor under ro-kolkata
Rfq-2025 for the maintenance works to be taken up on risk and cost of the concessionaire / contractor under ro-kolkata
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreSouth central railway construction organization-engineering, procurement and construction (epc) contract for doubling of track between manyamkonda station (excl)& perur station(incl) from km 128.200 to km 156.700(28.500 km) including electrification & signaling works in connection with doubling of mahabubnagar-dhone section in the state of telangana.
For complete deion and other details, please refer to tender
Read moreof your Industry type