Tender Details
About Tender
🏭 Invitation For Bids: 66 Kv Line Shifting Project 🏭 The Department Of Power, State Govt. And Ut, Invites Bids For The Comprehensive Project Involving The Laying Of Tower Foundations, Erection Of Towers, And The Stringing And Sagging Of Conductors With An Earth Wire. This Project Is Aimed At Shifting The 66 Kv Line From Lalton To Narangwal Railpole Line Upon The Request Of Pstcl. 📅 Bid Submission Deadline: April 9, 2024, 12:00 Pm Tender Fee: Inr 1799 Emd: Inr 10,500 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In High Voltage Power Line Projects. Detailed Proposals Should Include A Methodology For Foundation Laying, Tower Erection, And Conductor Installation, Along With A Timeline For Project Completion. Keywords: Power Line Project, Tower Foundations, Tower Erection, Conductor Stringing, Sagging, 66 Kv Line Shifting, Pstcl, Department Of Power, State Govt. And Ut, Bid Submission, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Laying Of Tower Foundations, Erection Of Towers And Stringing And Sagging Of Conductor With Earth Wire For Shifting Of 66 Kv Line Lalton To Narangwal Railpole Line On Request Of Pstcl.
|
Description |
Laying Of Tower Foundations, Erection Of Towers And Stringing And Sagging Of Conductor With Earth Wire For Shifting Of 66 Kv Line Lalton To Narangwal Railpole Line On Request Of Pstcl.
|
Organisation | Department of Power | State Govt. and UT |
Tender Id | 2024_POWER_116664_1 |
Reference Number |
35/PT-531/TLCJAL/2023-24 |
Tender Fee | 1799 |
EMD | 10500 |
Tender Value | |
Place | LALTON KALAN |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=238198 |
Start Date | January 31, 2024 22:30 |
End Date |
09/04/2024 ( Expired 377 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Read moreReplacement of panther conductor with htls conductor of 132 kv sitarganj pgcil eldeco sitarganj single circuit line and 132 kv sitarganj kichha single circuit line
Replacement of panther conductor with htls conductor of 132 kv sitarganj pgcil eldeco sitarganj single circuit line and 132 kv sitarganj kichha single circuit line
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreOutsourcing of labour part for erection, testing and commissioning of new 11kvlt/ht lines on rail/pcc poles, distribution t/fs, augmentation/sagging of acsr of ht/lt lines, cables laying, guarding, stay set for various works such as releasing of t/we
Outsourcing of labour part for erection, testing and commissioning of new 11kvlt/ht lines on rail/pcc poles, distribution t/fs, augmentation/sagging of acsr of ht/lt lines, cables laying, guarding, stay set for various works such as releasing of t/we
Read moreWss from sadas rajgarh ips cwrm ps and ohsrs cvdm and fhtc of blocks gangrar 2 villages chittorgarh 212 villages nimbahera 66 villages and bhadesar 45 villages and bulk ws to chittorgarh town package 2b under jjm with oandm for 10y after dlp of 1y
Wss from sadas rajgarh ips cwrm ps and ohsrs cvdm and fhtc of blocks gangrar 2 villages chittorgarh 212 villages nimbahera 66 villages and bhadesar 45 villages and bulk ws to chittorgarh town package 2b under jjm with oandm for 10y after dlp of 1y
Read moreProviding and laying of pipe line for water supply from grathlan nallah near surge shaft road to power house field hostel at power house site office area, pakal dul he project, kishtwar, jnk
Providing and laying of pipe line for water supply from grathlan nallah near surge shaft road to power house field hostel at power house site office area, pakal dul he project, kishtwar, jnk
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreof your Industry type