Tender Details
Particulars | Details |
---|---|
Title |
Provision Of Toilet Water Cooler,Water Purifier And Construction Of Water Booth Along With Required Pipe Line Work And Electrification At (1) Govt. Upper Primary School, Phaspi (2) Govt. Upper Primary School Rengali ,Kuikeda(3)govt.Primary Scho
|
Description |
Provision Of Toilet, Water Cooler, Water Purifier And Construction Of Water Booth Along With Required Pipe Line Work And Electrification At (1) Govt. Upper Primary School, Phaspi (2) Govt. Upper Primary School Rengali , Kuikeda (3) Govt. Primary Scho
|
Organisation | Munitions India Limited | Public Sector Undertakings |
Tender Id | 2024_MIL_180726_1 |
Reference Number |
3012/Genl/TE-27(2023-24)/EO(C) |
Tender Fee | 0 |
EMD | 35250 |
Tender Value | |
Place | Ordnance Factory Badmal, Balangir, Odisha |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=197818 |
Start Date | January 07, 2024 00:25 |
End Date |
22/01/2024 ( Expired 483 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Arc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Arc for work of construction and commissioning of 200 mm dia tube well with pljt of pipe line with 2 years of dlp under sub division behror under jurisdiction of executive engineer phed behror district kotputli-behror.
Read moreArc for work of construction and commissioning of 200 mm dia tw with pljt of pipe line with 2 years of dlp under sub division virat nagar under jurisdiction of ee phed paota district kotputli-behror
Arc for work of construction and commissioning of 200 mm dia tw with pljt of pipe line with 2 years of dlp under sub division virat nagar under jurisdiction of ee phed paota district kotputli-behror
Read moreRenovation of 33/3.3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Renovation of 33 3 3 kv power transformers switchyard equipments with allied accessories and hardware etc complete along with 2 years operation work for lower terana lift irrigation scheme stage no 1 to 5
Read moreSupply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Supply of hand pump spare parts i.s.i. mark and conforming to is/5500 part (1) ball bearing 20 bc opp (2) hexagonal bolt m-12 x1.75 x40 (3) hexagonal nut m-12 x 1.75 (4) hexagonal coupler m 12 x 1.75 (5) reducer cap (6) cylinder with brass line
Read moreRough cost estimate for providing and laying of 200mm dia. s.w. pipe sewer line in gali no. 1 and linking with gali no.2 in adarsh nagar - hari vihar, newly approved colony in ballabgarh ward no.40.
Rough cost estimate for providing and laying of 200mm dia. s.w. pipe sewer line in gali no. 1 and linking with gali no.2 in adarsh nagar - hari vihar, newly approved colony in ballabgarh ward no.40.
Read moreConstruction of siltation chamber and leach pit 7 nos at 1 goyalpara dugdha samity submersible pump 2 goyalpara primary school 3 goyalpara baroaritala 4 goyalpara mathkalitala 5 birahimpur dakshineswar shib mandir 6 birahimpur ssk subm
Construction of siltation chamber and leach pit 7 nos at 1 goyalpara dugdha samity submersible pump 2 goyalpara primary school 3 goyalpara baroaritala 4 goyalpara mathkalitala 5 birahimpur dakshineswar shib mandir 6 birahimpur ssk subm
Read moreRepair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Repair and cleaning of storm water drain 1 sikri sweet chowk to raiway line 2. chhati patshahi gurudwara to railway station 3.railway road to sai chowk 4. pehowa road both side roads 5.foji colony to railway road 6. laxman chowk via sikri sweet to
Read moreCons of new sump and pump, swd, fixing hdpe pipe line 1 and 2 with submer motor with electrical arrangements and panel board at elaya st, jn.of cross rd in dn.40 and dismant exist swd recons of top slab and wall rising at ms naidu st in dn48, z4, p11
Cons of new sump and pump, swd, fixing hdpe pipe line 1 and 2 with submer motor with electrical arrangements and panel board at elaya st, jn.of cross rd in dn.40 and dismant exist swd recons of top slab and wall rising at ms naidu st in dn48, z4, p11
Read moreService and repair and mtc. of split window type ac and drinking water cooler along with other allied works at various (nrb) like sampark centres, hwcs prayas building, govt. schools etc under mtc. booth of sector 38, u.t., chandigarh (ch. to running
Service and repair and mtc. of split window type ac and drinking water cooler along with other allied works at various (nrb) like sampark centres, hwcs prayas building, govt. schools etc under mtc. booth of sector 38, u.t., chandigarh (ch. to running
Read moreRepairing seepage by replacement of damaged pipeline with waterproofing work in the toilet area, repair painting works of internal area including all rooms, common area, dining, kitchen and external repair painting works of rosaline hostel (1 and 2)
Repairing seepage by replacement of damaged pipeline with waterproofing work in the toilet area, repair painting works of internal area including all rooms, common area, dining, kitchen and external repair painting works of rosaline hostel (1 and 2)
Read moreof your Industry type