Tender Details
About Tender
🚚🏭 Ntpc Limited Bid Invitation For Coal Transportation 🚦 Ntpc Limited, A Leading Public Sector Undertaking, Invites Bids For The Transportation Of 5.0 Lmt (Lakh Metric Tonnes) Of Coal From Talaipalli Mines To Solpaur Stps Under Rcr (Railway Earnings Contract Route) Mode, Via Korichhapar Siding. 📅 Bid Submission Deadline: June 10, 2024, 3:00 Pm Tender Fee: Inr 10,620 Emd: Inr 20,00,000 Interested Bidders Must Possess The Necessary Infrastructure And Expertise To Handle Large Scale Coal Transportation Projects. Detailed Bids Should Include Logistics Plans, Pricing, And Compliance With Safety And Environmental Regulations. Keywords: Ntpc Limited, Coal Transportation, Rcr Mode, Talaipalli Mines, Solpaur Stps, Korichhapar Siding, Bid, Tender, Public Sector UndertakingParticulars | Details |
---|---|
Title |
Transportation Of 5.0 Lmt Coal From Talaipalli Mines To Solpaur Stps Under Rcr Mode Via Korichhapar Siding.
|
Description |
Transportation Of 5.0 Lmt Coal From Talaipalli Mines To Solpaur Stps Under Rcr Mode Via Korichhapar Siding.
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_87043_1 |
Reference Number |
NTPC/USSC-CPG1/9900280588 |
Tender Fee | 10620 |
EMD | 20 Lakh |
Tender Value | |
Place | Western Region Head Quarter-II |
Link | http://www.ntpctender.com/nit/listJobs.asp?nitId=27155 |
Start Date | May 20, 2024 15:30 |
End Date |
10/06/2024 ( Expired 337 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreTender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Tender for road transportation of black oil (fo/ldo/premium lshs) by top loading tank lorries from bpcl kochi terminals, kerala to various locations (direct customers, etc.) within state and outside state.
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreof your Industry type