Tender Details
Particulars | Details |
---|---|
Title |
Testing And Calibration Of Different Electrical Equipment Related To Ht Installation Ocb Mocb Transformers Protective Relays Of Damini Ug Mine And Bangwar Ug Mine Of Abd Sub Area Of Sohagpur Area Secl
|
Description |
Testing And Calibration Of Different Electrical Equipment Related To Ht Installation Ocb Mocb Transformers Protective Relays Of Damini Ug Mine And Bangwar Ug Mine Of Abd Sub Area Of Sohagpur Area Secl
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_333216_1 |
Reference Number |
SECL/SGP/EnM/eT/24-25/312 Dtd 24.03.2025 |
Tender Fee | 0 |
EMD | 8200 |
Tender Value | |
Place | Bangwar UG Damni UG mine |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345420 |
Start Date | March 27, 2025 15:30 |
End Date |
10/04/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreContractual work of 3nos sub-station installation and cable laying in w7b panel in ug at chhatarpur mine no. 1 of pathakhera area.
Contractual work of 3nos sub-station installation and cable laying in w7b panel in ug at chhatarpur mine no. 1 of pathakhera area.
Read moreElectrical maintenance of lt(440v) and ht(3.3kv 33kv) overhead line and sub stations, electrification of netaji subhashchndra bose stadium kapildhara colony, wiring of shramik sadan, pre monsoon for kurja ug mine of kurja sub area
Electrical maintenance of lt(440v) and ht(3.3kv 33kv) overhead line and sub stations, electrification of netaji subhashchndra bose stadium kapildhara colony, wiring of shramik sadan, pre monsoon for kurja ug mine of kurja sub area
Read moreSupplying installation testing and commissioning of automatic misting system including civil work at shanti path from ring road to nyaya marg round about.
Strengthening of water supply infrastructure assets in ndmc area.&#x0d sub. head- supplying installation testing and commissioning of automatic misting system including civil work at shanti path from ring road to nyaya marg round about.
Read moreFabrication of 279 nos of steel cogs of different sizes at rajendra ug mine of r and k sub area of sohagpur area secl
Fabrication of 279 nos of steel cogs of different sizes at rajendra ug mine of r and k sub area of sohagpur area secl
Read moreRepairing of surface haulage of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Repairing of surface haulage of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Read moreProviding and fixing of ngr in different type of power transformer 500 kva 3.3kv 550v oil cooled and in 04 nos trans switch unit 315 kva 3.3kv 550v flp air cooled installed at rajendra ug mine of r and k sub area of sohagpur area secl
Providing and fixing of ngr in different type of power transformer 500 kva 3.3kv 550v oil cooled and in 04 nos trans switch unit 315 kva 3.3kv 550v flp air cooled installed at rajendra ug mine of r and k sub area of sohagpur area secl
Read moreSpecial repairs to e/m installation and provn of ht ug cable for gate no 8 to mes barabanki sub station under ge (east) lucknow
Special repairs to e/m installation and provn of ht ug cable for gate no 8 to mes barabanki sub station under ge (east) lucknow
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreTesting and calibration of different electrical equipment related to ht installation ocb mocb transformers protective relays of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Testing and calibration of different electrical equipment related to ht installation ocb mocb transformers protective relays of damini ug mine and bangwar ug mine of abd sub area of sohagpur area secl
Read moreof your Industry type