Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hubballi Division: Proposed For Improvement To Lc Gates In Hpt Tngl Rnjp Section.(Maintenance Period=03months)
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72470425 |
|
Reference Number |
42UBL23-24DT141223ITEM-02 |
| Tender Fee | 0 |
| EMD | 1.7 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72470425/viewNitPdf_4419722.pdf |
| Start Date | December 15, 2023 23:43 |
| End Date |
Expired
09/01/2024
Expired 1008 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
S and t work for interlocking of lc gates with tvu - 10,000 in delhi bathinda, sonipat gohana and shamli tapri sections of delhi division of northern railway as per boq
S and t work for interlocking of lc gates with tvu - 10,000 in delhi bathinda, sonipat gohana and shamli tapri sections of delhi division of northern railway as per boq
Read moreCustom bid for services - kuppam proposed operation of sewage treatment plant at kuppam station in aden bangarpet sub-division for a period of 2 years
Custom bid for services - kuppam proposed operation of sewage treatment plant at kuppam station in aden bangarpet sub-division for a period of 2 years
Read moreProposed comprehensive annual maintenance of 1 no of 100 kva diesel generator for a period of one year at uchc hospital injambakkam dn-194 ,zone xv
Proposed comprehensive annual maintenance of 1 no of 100 kva diesel generator for a period of one year at uchc hospital injambakkam dn-194 ,zone xv
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreCustom bid for services - aden bwt sub division proposed cleaning and maintenance of existing sewer lines in railway colonies, service buildings and stations for a period of 24 months mechanized method
Custom bid for services - aden bwt sub division proposed cleaning and maintenance of existing sewer lines in railway colonies, service buildings and stations for a period of 24 months mechanized method
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreProposed rate contract for routine maintenance works for staff quarters for a period of twelve months in which the tasks will be performed on a piece-meal basis, as and when required, throughout the duration of the agreement at nit warangal
Proposed rate contract for routine maintenance works for staff quarters for a period of twelve months in which the tasks will be performed on a piece-meal basis, as and when required, throughout the duration of the agreement at nit warangal
Read moreProposed rate contract for routine maintenance works for hostel areas for a period of twelve months in which the tasks will be performed on a piece-meal basis as and when required throughout the duration of the agreement at nit warangal
Proposed rate contract for routine maintenance works for hostel areas for a period of twelve months in which the tasks will be performed on a piece-meal basis as and when required throughout the duration of the agreement at nit warangal
Read moreStrengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Strengthening of mofada khedi ahir bamhangaon road, total length 4.80 km. (proposed length 1.81 km.) under p.w.d. sub dn. seoni malwa. 3rd call, pac rs. 121.44 lacs on road bridge works sor 11.04.2025 (ammendment upto date), completion period 90 day
Read moreHubballi division: proposal for improvement to lc gates in hpt-tngl-rnjp section.(maintenance period=03months)
For complete deion and other details, please refer to tender
Read moreof your Industry type