🏗️ Nlc India Limited Is Calling For Bids For C And I Auxiliary Work During Shutdown And Forced Outage Periods Within Its Thermal Power Station Complex. 🔧 🗓️ Submission Deadline: July 12, 2024, 3:00 Pm This Custom Bid For Services Is Aimed At Ensuring The Highest Standards Of Auxiliary Support During Critical Operational Periods. Interested Parties Should Prepare And Submit Detailed Proposals Before The Specified Deadline. Keywords: Nlc India Limited, Custom Bid, C And I Auxiliary Work, Thermal Power Station, Shutdown, Forced Outage, Government Contract| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services C And I Auxiliary Work During Shutdown And Forced Outage Period In Tpsi E
|
| Description |
|
| Organisation | NLC India Limited | Ministry of Coal |
| Tender Id | GEM/2024/B/5021017 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 21, 2024 15:49 |
| End Date |
Expired
12/07/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
SRI VENKATESWARA CONSTRUCTIONS
253894.36
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | S SIVAKUMAR | 11-07-2024 11:32:43 | N/A | Disqualified |
| 2 | SRI DEV CONTRACTORS | 11-07-2024 14:51:27 | MSE | Disqualified |
| 3 | SRI VENKATESWARA CONSTRUCTIONS | 10-07-2024 18:26:22 | MSE | Qualified |
| 4 | YOHESH ENGINEERING CORPORATION | 12-07-2024 13:29:31 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SRI VENKATESWARA CONSTRUCTIONS( MSE Social Category:OBC ) | Item Categories : Custom Bid for Services - C and I auxiliary work during shutdown and forced outage period in TPSI E | 253894.36 | L1 |
| 2 | YOHESH ENGINEERING CORPORATION( MSE Social Category:General ) | Item Categories : Custom Bid for Services - C and I auxiliary work during shutdown and forced outage period in TPSI E | 262162.33 | L2 |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Custom Bid for Services - C and I auxiliary work during shutdown and forced outage period in TPSI EXP | Custom Bid for Services | 1 | ₹ 253894.360 |
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreCustom bid for services - 200142425 biennial job contract for primary ndt work during forced outage
Read more
Cold water tunnel cleaning of unit_ii during the shutdown period of 2023_24
Cold water tunnel cleaning of unit_ii during the shutdown period of 2023_24
Read moreof your Industry type