Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Flood Protection Work By Way Of 18m Long Stud 6 Nos. With 6m Apron On Right Side Of River Nikki Tawi From Omman Post To Makwal Forward Post Along International Border At Village Makwal (At Spots) Part A
|
Description |
Construction Of Flood Protection Work By Way Of 18m Long Stud 6 Nos. With 6m Apron On Right Side Of River Nikki Tawi From Omman Post To Makwal Forward Post Along International Border At Village Makwal (At Spots) Part A
|
Organisation | I and FC | State Govt. and UT |
Tender Id | 2024_IFC_262794_1 |
Reference Number |
69/EE/CD-IV/IFC/2024-25 |
Tender Fee | 5000 |
EMD | 5.36 Lakh |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=794542 |
Start Date | October 30, 2024 23:30 |
End Date |
21/11/2024 ( Expired 153 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
03/6 anit dt. 27/02/2025 protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other d
Protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other defence installations for
Read moreConstruction of flood protection work on left/ right side of river nikki tawi at village dundhpur mukhra near ram mandir at phallian mandal area.
Construction of flood protection work on left/ right side of river nikki tawi at village dundhpur mukhra near ram mandir at phallian mandal area.
Read moreConstruction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6
Construction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6
Read moreConstruction of flood protection work by way of revetment crates and earthen embankment on right side of river nikki tawi from village sum jawalapur to border village makwal camp (part-a)
Construction of flood protection work by way of revetment crates and earthen embankment on right side of river nikki tawi from village sum jawalapur to border village makwal camp (part-a)
Read moreConstruction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a
Construction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a
Read moreConstruction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)
Construction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)
Read moreConstruction of flood protection work along right bank of nikki tawi upstream surya chak bridge
Construction of flood protection work along right bank of nikki tawi upstream surya chak bridge
Read moreConstruction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)
Construction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)
Read moreFlood protection work at goshan nallah by way of crate work downstream side of national highway culvert over goshan nallah for length of 240mtr on both sides of vulnerable spots.
Flood protection work at goshan nallah by way of crate work downstream side of national highway culvert over goshan nallah for length of 240mtr on both sides of vulnerable spots.
Read moreConstruction of protection work by way of revetment crates and earthen embankment on right side of river nikki tawi at village toph manhasan at spots.
Construction of protection work by way of revetment crates and earthen embankment on right side of river nikki tawi at village toph manhasan at spots.
Read moreof your Industry type