Tender Details

Particulars Details
Title
Construction Of Flood Protection Work By Way Of 18m Long Stud 6 Nos. With 6m Apron On Right Side Of River Nikki Tawi From Omman Post To Makwal Forward Post Along International Border At Village Makwal (At Spots) Part A
Description
Construction Of Flood Protection Work By Way Of 18m Long Stud 6 Nos. With 6m Apron On Right Side Of River Nikki Tawi From Omman Post To Makwal Forward Post Along International Border At Village Makwal (At Spots) Part A
Organisation I and FC | State Govt. and UT
Tender Id 2024_IFC_262794_1
Reference
Number
69/EE/CD-IV/IFC/2024-25
Tender Fee 5000
EMD 5.36 Lakh
Tender Value
Place Jammu
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=794542
Start Date October 30, 2024 23:30
End Date

21/11/2024 ( Expired 153 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
03/6 anit dt. 27/02/2025 protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other d

Protecting / strengthening of right edge of river ravi at bop tota complex by providing revetment / t-studs near of indo-pak fencing line to save international border fencing line, flood lights and village abas and other defence installations for

Read more
Construction of flood protection work on left/ right side of river nikki tawi at village dundhpur mukhra near ram mandir at phallian mandal area.

Construction of flood protection work on left/ right side of river nikki tawi at village dundhpur mukhra near ram mandir at phallian mandal area.

Read more
Construction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6

Construction of green space/strip along tawi river by way of development of land, surface dressing/leveling, providing and fixing of tree guards, footpath including protection works from tawi bridge towards kadir shah basti upstream side in ward no-6

Read more
Construction of flood protection work by way of revetment crates and earthen embankment on right side of river nikki tawi from village sum jawalapur to border village makwal camp (part-a)

Construction of flood protection work by way of revetment crates and earthen embankment on right side of river nikki tawi from village sum jawalapur to border village makwal camp (part-a)

Read more
Construction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a

Construction of flood protection work by way of 18m long stud 6 nos. with 6m apron on right side of river nikki tawi from omman post to makwal forward post along international border at village makwal (at spots) part-a

Read more
Construction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)

Construction of flood protection work of revetment crates and earthen embankment to safeguard the critical/ vulnerable 8 spot at belicharana on left side of river nikki tawi (at spot)

Read more
Construction of flood protection work along right bank of nikki tawi upstream surya chak bridge

Construction of flood protection work along right bank of nikki tawi upstream surya chak bridge

Read more
Construction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)

Construction of flood protection work by way of revetment crates and earthen embankment on left side of river nikki tawi in firing range raipur satwari and u/s of surya chak bridge (at spots)

Read more
Flood protection work at goshan nallah by way of crate work downstream side of national highway culvert over goshan nallah for length of 240mtr on both sides of vulnerable spots.

Flood protection work at goshan nallah by way of crate work downstream side of national highway culvert over goshan nallah for length of 240mtr on both sides of vulnerable spots.

Read more
Construction of protection work by way of revetment crates and earthen embankment on right side of river nikki tawi at village toph manhasan at spots.

Construction of protection work by way of revetment crates and earthen embankment on right side of river nikki tawi at village toph manhasan at spots.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise