Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Self Grip Slitting Insert Gsfn 5.2 1.5
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2025/B/6218538 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 17, 2025 17:54 |
| End Date |
Expired
07/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply, installation and commissioning of demineralised water unit, capacity 1.5 cu. m. /h
Supply, installation and commissioning of demineralised water unit, capacity 1.5 cu. m. /h
Read moreRepair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Read moreLaying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreLaying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Laying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Read moreLaying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Laying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Read moreLaying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Laying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Read moreProviding of temporary lighting on hire basis with 110/120w led lights at various locations in nacharam circle -8 on the occasion of bathukamma festival for 2 days in the month of october-2026.(rs: 1.5 lakhs)
Providing of temporary lighting on hire basis with 110/120w led lights at various locations in nacharam circle -8 on the occasion of bathukamma festival for 2 days in the month of october-2026.(rs: 1.5 lakhs)
Read moreSupply, erection, testing and commissioning of lot-i (i) 2nd circuit stringing (28 km) on existing 132kv dc/sc line from 132/33kv ss ayyagaripally to 132/33kv ss nellikuduru (ii) 1no. 132kv bay at ayyagaripally ss and (iii) 1no. 132kv bay at nellikuduru ss in mahabubabad district and lot-ii (i) 2nd circuit stringing (5.2 km) on existing 132kv dc/sc line from 132/33kv ss kamalapur to 132/33kv ss nv puram (ii) 1no. 132kv bay at kamalapur ss (iii) 1no. 132kv bay at nvpuram in mulugu district on tu
Supply, erection, testing and commissioning of lot-i (i) 2nd circuit stringing (28 km) on existing 132kv dc/sc line from 132/33kv ss ayyagaripally to 132/33kv ss nellikuduru (ii) 1no. 132kv bay at ayyagaripally ss and (iii) 1no. 132kv bay at nellikuduru ss in mahabubabad district and lot-ii (i) 2nd circuit stringing (5.2 km) on existing 132kv dc/sc line from 132/33kv ss kamalapur to 132/33kv ss nv puram (ii) 1no. 132kv bay at kamalapur ss (iii) 1no. 132kv bay at nvpuram in mulugu district on turnkey basis.
Read moreLaying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Laying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Read moreof your Industry type