Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Clinker Grinder Spares
|
| Description |
Supply Of Clinker Grinder Spares
|
| Organisation | Jhabua Power Ltd | Public Sector Undertakings |
| Tender Id | 2024_JPL_196634_1 |
|
Reference Number |
JPL/CnM/24-25/1100012082 |
| Tender Fee | 0 |
| EMD | 50000 |
| Tender Value | - |
| Place | Jhabua Power Limited (A JV of NTPC),Seoni,MP |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218342 |
| Start Date | June 26, 2024 17:30 |
| End Date |
Expired
04/07/2024
Expired 831 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreProcurement of spares for premium transmission make gear box (model sp 218/6.7) installed for clinker grinder of unit 3 and 4 at ahp-ii , 2x660 mw, sstpp, mppgcl, dongalia.
Procurement of spares for premium transmission make gear box (model sp 218/6.7) installed for clinker grinder of unit 3 and 4 at ahp-ii , 2x660 mw, sstpp, mppgcl, dongalia.
Read moreBulb electric,spares,nut,bulb,assy,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,tool,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares
Bulb electric,spares,nut,bulb,assy,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,tool,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares,spares
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreTtps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Ttps mech ii ahp replacement of clinker grinder feed gate assembly power cylinders and its connected pipe lines feed sump hydraulic ejector assembly regular make up jetting assembly connected pipe lines flushing header assembly bah structural
Read moreof your Industry type