Tender Details
About Tender
🏗️ Urgent Construction Project At Nehu, Shillong 🏗️ North Eastern Hill University (Nehu), Under The Aegis Of The Central Government, Has Issued An Urgent Call For Tenders For The Construction Of A New Inspection Chamber At The Backside Of Hostel No. 18 On Its Permanent Campus In Shillong. This Project Is Necessitated Due To A Blockage In The Soil Line. 📅 Bid Submission Deadline: April 15, 2024, 12:00 Pm Interested Contractors Must Submit A Tender Fee Of Inr 500 And An Earnest Money Deposit (Emd) Of Inr 3000. Proposals Should Detail The Methodology, Timelines, And Costs Associated With The Construction, Ensuring Compliance With All Relevant Safety And Environmental Regulations. Keywords: Construction, Inspection Chamber, Nehu, Shillong, Tender, Emd, Government Project, Soil Line BlockageParticulars | Details |
---|---|
Title |
Urgent Construction Of New Inspection Chamber At Back Side Of The Hostel Due To Blockage Of Soil Line At Hostel No 18 At Permanent Campus, Nehu, Shillong.
|
Description |
Urgent Construction Of New Inspection Chamber At Back Side Of The Hostel Due To Blockage Of Soil Line At Hostel No 18 At Permanent Campus, Nehu, Shillong.
|
Organisation | North-Eastern Hill University (NEHU) | Central Govt. Ministry/Department |
Tender Id | 2024_NEHU_803464_1 |
Reference Number |
CD/ESTM/4255/2023-35 dated-09/04/2024 |
Tender Fee | 500 |
EMD | 3000 |
Tender Value | |
Place | NEHU, Shillong. |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=844548 |
Start Date | April 10, 2024 15:30 |
End Date |
15/04/2024 ( Expired 394 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreHeightening of boundary wall at back side of jasper hostel and three stretches of amber hostel (part attached to middle school dhaiya, between block c and d outer side and back side) at iit (ism), dhanbad
Heightening of boundary wall at back side of jasper hostel and three stretches of amber hostel (part attached to middle school dhaiya, between block c and d outer side and back side) at iit (ism), dhanbad
Read moreConstruction of rcc drain in national angar pathra satendra singh house to main nala and back side of cisf camp jageswar house to narayan chouwhan house janki yadav to main nala and sethji shop to govind house and different location in ward no.04/05
Construction of rcc drain in national angar pathra satendra singh house to main nala and back side of cisf camp jageswar house to narayan chouwhan house janki yadav to main nala and sethji shop to govind house and different location in ward no.04/05
Read moreShifting of tower no t57 at village khera and tower no t03 and t04 at village bagbania of 66 kv s/c barotiwala nalagarh transmission line due to four laning of pinjore nalagarh nh under es division hpsebl nalagarh on turnkey basis
Shifting of tower no t57 at village khera and tower no t03 and t04 at village bagbania of 66 kv s/c barotiwala nalagarh transmission line due to four laning of pinjore nalagarh nh under es division hpsebl nalagarh on turnkey basis
Read moreFlooring work in rh-(1, 2, 3, 4, 17, 18, 19, 20, 33, 34, 35, 36) 12 nos qtrs and repairing and water proofing work h-type and g-type qtrs (5 nos) and laying of pipe line work and construction of gate no-3 and cow catcher work at police radio colony
Flooring work in rh-(1, 2, 3, 4, 17, 18, 19, 20, 33, 34, 35, 36) 12 nos qtrs and repairing and water proofing work h-type and g-type qtrs (5 nos) and laying of pipe line work and construction of gate no-3 and cow catcher work at police radio colony
Read moreConstruction of permanent bridge over dhalai river on santirbazar to chankap road at ch. 0.350 km. (job no. tp/com/216/2024-25)
Construction of permanent bridge over dhalai river on santirbazar to chankap road at ch. 0.350 km
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of compound wall at industrial growth center, polagam, karaikal
Construction of compound wall to the campus of new bore well existing pumphouse and overhead tank at industrial growth center, polagam, karaikal.
Read moreof your Industry type