Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Flowable Composite True Nano Z 350 Xt
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106412154 |
|
Reference Number |
30246557 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106412154/viewNitPdf_4652148.pdf |
| Start Date | July 23, 2024 00:34 |
| End Date |
Expired
08/08/2024
Expired 679 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-nam- saap 2024-2025 gahmuzhoor -kottayam-upgradation of govt. ayurveda hospital muzhoor-kottayam district composite work
The govt ayurveda hospital, muzhoor located in akalakkunnam grama panchayat kottayam district
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreP and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
Read moreGlass ionomer cement,composite nano hybrid kit,composite nano hybrid syringe,nano flowable composit
Read more
Zinc phosphate cement,flowablea2,flowable a3,flowable a3.5,composite beutifil bulk,composite beutif
Read more
of your Industry type